<<.<f<<<<'<<<<<<<<<<<< QUALITY FIRST >>>>>>>>>>>>>>>>>>>> W .;
ORIGINAL UNIT 2 SONGS MAT?NTENANCF ORDER NO: 08020457000 CATEGORY: 70 - Work In Progress REPETITIVE MAINT. NO. - 30002002000 INTERVAL - 01 FREQUENCY - W RESPONSIBLE ORG:ELECTRICAL UNIT 2 MAINTENANCE TYPE: SV FQTJTPMENT TD: S21806EB007 RC:CB CONST. CODE:N/A PRIORITY: DD SU SYSTEM: PKA ACCOUNTING DISTRIBUTION:0121 7221 QC WITNESS/HOLD REQD: N FUNC DESC: 125VDC STATION BATTERY 2D1 LOCATION. AREA: CB ROOM: 306E ELEVATION: 050 COLUMN: 18.5N1 [QUAL CLASS: 2 NOTE: WORKLIST ATTACHED *t*
DESCRIPTION:
WEEKLY 1E BATTERIES INSP.- UNIT 2 RCM-CRITICAL/TS/RCM/PMO/AR040201281 97 REMARKS!
New Add BOOX.
REQUESTOR DATA:
CREW CODE: EWo DCP: ENVIRN QUAL: N PROJECT CODE: SEIS: 1 REQUESTING DEPT: EL2 ] I REQUESTOR NAME: (b)(6) PAX:
REQUIREMENTS: FIRE PROT. ADMIN. REQD? Y WORK AUTH REQD? N SECURITY REQD? N WORK AUTH TYPE? N SSR REQD?
ASME CODE WORK? N NO. N/A ENGINEERING REQD? N MO TO DISP NCR? N NO. N/A FME REQUIREMENI'S? N TEMPORARY MOD.? N NO. N/A R.E.P. EVAL. REQD? N CREACUS BREACH? N FCN REQD? NO.
ECd' REQD? NO.
SCHEDULING:
R.M. DUE DATE 2/12/2008 00 :00 RI7PS: DUE DATE 2/12/2008 06:30 VIOLATION DATE 2/24/2008 00: 30 SCHEDULED START DATE 2/12/2008 00:30 18:00
- -0o (b)(6) c SCHEDULED COMP DATE 2/13/2008 MO OBJECTIVE:
Perform weekly inspection of 1E baLterys.
POOR QUAUITY DOUMEPJT
__PST AVAIL An' .
(b)(6) 08 02 0457 -0 SIGNEI ___
Page I ?
Originator File Copy
-7 8020457000 '..9
/
MO: 08020457000 ORIGINAL @ Category 70 (WORK PLAN DETAIL CONTINUED)
WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.
- 2. VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BATTERY AREA AS FOLLOWS:
A. AS NECESSARY, WIPE THE CELL JARS, BATTERY RACKS, AND FLOOR WITH A SOLUTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.
B. WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.
C. VERIFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACH BATTERY ROOM.
PLANNING APPROVALS:
8Y DATE TI ME FIRE PROTECTION REVIEW (b)(6) 02/12/96 14:14:00 WORK PLANNED 02/12/96 14:13:59 WORK PLANNED REVIEW 02/12/96 14:26:45 WORK SCHEDULED 02/06/08 13:55:59 PROCEDURE LIST:
PROCEDURE ID REV TCN I - S0123-I-2.2 0007 002 Desc: 125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMATION:
CRAFT CODE CRAFT DESCRIPTION QTY ESTIMATED HOURS ACTUAL HOURS I - EL ELECTRICIAN 2.0 6.0 2 - SP FIRST LINE SUPERVISOR 1.0 2.0 WORK DONE:
Work Started: Date - OZ ILejI Time -_ 0 Page 5 o08 0 0457-0 10204 571000
MO; 08020457000 ORIGINAL @ Category 70 (WORK UONE CONTINUED)
^
f(b)(6) '- I-08020457-0 Page 6
NUCLEAR ORGANIZATION MAINTENANCE PROCEDURE SO123-1-2.2 UNITS 1, 2 AND 3 REVISION 7 PAGE 2 OF 47 TCN 7-2 1.o OBJECTIVES 1.1 This procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.4 This procedure is applicable to the 125 VDC Station Battery Banks.
2-0 REFERENCES 2.1 Refer to Attachment 1 for the Procedure Resource List.
3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S01 23-1-1.3.
3.2 Enter the following data:
b MO# 6~o(9wv7Qco
]Unit E~IEquip Id: 9 Oro T5 0 0 'g 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 Is true.
06020457-0
- 0123-1-2.2
- 020457000
- I .
NUCLEAR ORGANIZATION MAINTENANCE PROCEDURE SO 123-1-2.2 UNITS 1, 2 AND 3 REVISION 7 PAGE 7 OF 47 TCN 7-2 I
NOTE: When taking Battery Bank Terminal Voltage, use a Fluke 187
( equivalent or befter) set on the 500V range. If necessary, reference Design Ca/c E4C-01 7.
6.2 Battery Bank Voltage T/S REOUIREMENT 6.2.1 Measure Battery Bank Terminal voltage. Record readings below.
IACCEPTANCE C.rrE.,A I All 125 VDC Battery Banks: 129.17 VDC jj,9 VDC SAT Go to Step 6.2.2. UNSAT I E Perform Corrective I ~Actions as Follows. ut~ d~
- e of r
.1 Immediately notify your Supervisor of the "UNSA T1 condition.
.2 This Supervisor SHALL report a failed Surveillance according to Procedure S01 23-1-1.3. IKCPI
.3 Notify the Engineer, and generate an AR. P/Afc-P SETO OTNE6O ETPc 36 OSg 0d?0 4%5 7 0
- 0123- 1-2 .2
- 02045'/000