ML17209A220

From kanterella
Revision as of 10:47, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-049/03L-0
Date released: 01/25/2018 Download: ML17209A220


LER 80-049/03L-0:on 800904,during Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
ML17266A276
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A276 (3)
Forwards LER 80-049/03L-0
ML17209A219
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A219 (2)