ML17292B114

From kanterella
Revision as of 17:34, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-010-00 Concerning Item of Generic Interest Applicable to Facilities That Have Implemented Improved TSs (ITS) to Highlight Differences Between Reporting Guidelines of NUREG-1022 & Requirements of ITS
Date released: 06/27/2018 Download: ML17292B114


LER 97-010-00:on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established
ML17292B115
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1997
From: Rhoads J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17292B115 (4)
Forwards LER 97-010-00 Concerning Item of Generic Interest Applicable to Facilities That Have Implemented Improved TSs (ITS) to Highlight Differences Between Reporting Guidelines of NUREG-1022 & Requirements of ITS
ML17292B113
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1997
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1022
Download: ML17292B113 (2)