ML17313A575

From kanterella
Revision as of 09:47, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 98-003-01,per 10CFR50.73.Revised LER Provides Cause & Corrective Action for Delay in Bypassing Failed Instrument Used in PPS
Date released: 07/31/2018 Download: ML17313A575


LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters
ML17313A576
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/08/1998
From: Marks D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
References
Download: ML17313A576 (12)
Forwards LER 98-003-01,per 10CFR50.73.Revised LER Provides Cause & Corrective Action for Delay in Bypassing Failed Instrument Used in PPS
ML17313A574
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/08/1998
From: Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17313A574 (4)