ML17320B089

From kanterella
Revision as of 07:46, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Response to NRC 840221 Request for Addl Info Re Seismic Qualification of Mercoid Pressure Switches & Relays. Switches in Both Units Will Be Replaced by End of Next Unit 2 Fuel Outage.Agastat 7000 Relays Seismically Qualified
Date released: 05/31/2018 Download: ML17320B089


Forwards Response to NRC 840221 Request for Addl Info Re Seismic Qualification of Mercoid Pressure Switches & Relays. Switches in Both Units Will Be Replaced by End of Next Unit 2 Fuel Outage.Agastat 7000 Relays Seismically Qualified
ML17334A527
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/01/1984
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17334A527 (9)
Rev E to Model E7012/E7022 Series Timing Relays Class Ie.
ML17320B090
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/15/1981
From: Kiesler F
AMERACE CORP.
To:
References
Download: ML17320B090 (24)
Rept of Test for Seismic & Environ Testing of Mercoid Pressure Switches for American Electric Power Svc Corp.
ML17320B088
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/07/1981
From: Gilfoy R, Harizi P
ACTON ENVIRONMENTAL TESTING CORP.
To:
References
Download: ML17320B088 (551)