ML17329A222

From kanterella
Revision as of 04:28, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Corrected Tech Spec Pages 3/4 3-10 (Unit 1) & 3/4 3-9 (Unit 2),per 911002 & 16 Telcons W/Nrc.Corrections Affect Util Request to Deactivate Boron Injection Tank, Currently Under Review by NRC
Date released: 05/31/2018 Download: ML17329A222


Proposed Tech Spec Pages 3.4 3-10 & 3/4 3-9,consisting of Table 3.3-2, Reactor Trip Sys Instrumentation Response Times.
ML17329A223
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/23/1991
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17329A223 (21)
Forwards Corrected Tech Spec Pages 3/4 3-10 (Unit 1) & 3/4 3-9 (Unit 2),per 911002 & 16 Telcons W/Nrc.Corrections Affect Util Request to Deactivate Boron Injection Tank, Currently Under Review by NRC
ML17329A221
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/23/1991
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MURLEY T E
NRC
References
Download: ML17329A221 (5)