ML17340A969

From kanterella
Revision as of 23:43, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-005/01T-0
Date released: 07/31/2018 Download: ML17340A969


LER 81-005/01T-0:on 810310,drain Header to Floor of Component Cooling Water Pump & Heat Exchanger Room Backed Up.Caused by Overflow of Laundry Water from Monitor Tank. Laundry Water Transfer Terminated
ML17340A970
Person / Time
Site: Turkey Point 
Issue date: 03/24/1981
From: Simmons K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340A970 (4)
Forwards LER 81-005/01T-0
ML17340A968
Person / Time
Site: Turkey Point 
Issue date: 03/24/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340A968 (2)