ML20003C800

From kanterella
Revision as of 07:46, 29 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revision 2 to 90-day Response to Suppl 3 of IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Safety Relief Valve Position Indication Is Only TMI Action Plan Equipment Installed at Brunswick
Date released: 01/17/2020 Download: ML20003C800


Forwards Response to Addl Data Requests of Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Util Does Not Plan to Test or Replace nonsafety- Grade Equipment
ML20003C802
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/30/1981
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003C802 (18)
Forwards Revision 2 to 90-day Response to Suppl 3 of IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Safety Relief Valve Position Indication Is Only TMI Action Plan Equipment Installed at Brunswick
ML20003C799
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/30/1981
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003C799 (2)