ML20004C617

From kanterella
Revision as of 02:23, 29 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-019/03L-0
Date released: 01/18/2020 Download: ML20004C617


LER 81-019/03L-0:on 810313,during Normal operation,RC3,RC6 & RB3 Relays Tripped in Emergency Safeguards Actuation Channel B.Cause Attributed to Failed Hamlin Relay.Maint Revealed Addl Faulty Relays.Hamlin Replaced W/Cryden Relays
ML20004C619
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/1981
From: Bufe J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C619 (2)
Forwards LER 81-019/03L-0
ML20004C616
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/1981
From: Baynard P, Poole
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C616 (1)