ML20004E915

From kanterella
Revision as of 00:29, 29 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-019/03L-0
Date released: 01/18/2020 Download: ML20004E915


LER 81-019/03L-0:on 810527,steam-driven Auxiliary Feedwater Pump Was Removed from Svc for Planned Maint to Replace Bearings.Bearing Failure Caused by Inadequate Lubrication. Sightglass Marks Changed to Acceptable Level
ML20004E917
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/1981
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20004E917 (1)
Forwards LER 81-019/03L-0
ML20004E914
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/1981
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20004E914 (1)