ML20009A911

From kanterella
Revision as of 14:39, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-006/01T-0
Date released: 01/23/2020 Download: ML20009A911


LER 81-006/01T-0:on 810621,spray Additive Isolation Valve 1-831A Found Shut.Caused by Failure of Operator to Position Valve Correctly After Surveillance Testing.Valve Repositioned & Locked Open
ML20009A912
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/03/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009A912 (2)
Forwards LER 81-006/01T-0
ML20009A910
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/03/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009A910 (1)