ML20009H503

From kanterella
Revision as of 05:16, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Updated LER 81-057/03L-1
Date released: 01/23/2020 Download: ML20009H503


Updated LER 81-057/03L-0:on 800703,standby Liquid Control Relief Valve 1-C41-F029B Did Not Lift During Testing.Caused by Mechanical Drift of Setpoint.Setpoint Adjusted
ML20009H507
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/30/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009H507 (2)
Forwards Updated LER 81-057/03L-1
ML20009H502
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/29/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009H502 (1)