ML20010G931

From kanterella
Revision as of 20:05, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-140/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010G931


LER 81-140/03L-0:on 810814,channel 3 of Pressurizer Water Level Instrumentation Discovered to Have Failed.Caused by Improperly Seated Tubing Ferrule in High Pressure Ref Leg Side of Level Detector Sensing Line.Line Repaired
ML20010G937
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/11/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G937 (1)
Forwards LER 81-140/03L-0.Detailed Event Analysis Encl
ML20010G930
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/11/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G930 (3)