ML20024D508

From kanterella
Revision as of 09:23, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 83-058/03L-0 & 83-059/03L-0
Date released: 02/07/2020 Download: ML20024D508


LER 83-059/03L-0:on 830629,during Surveillance Test of Ice Condenser Baskets,Min Average Ice Weight of Sample Baskets from Bays 6,7,8 & 9 & Row/Groups 8-1,8-2 & 9-1 Found Nonconservative.Probably Caused by Natural Sublimation
ML20024D517
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/28/1983
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20024D517 (2)
LER 83-058/03L-0:on 830628,personnel Discovered 31-day Visual Verification of Blind Flange Over Fuel Transfer Tube CPN-1 Deleted.Caused by Mistake in 750407 Rev.Flange Visually Verified & Change Sheet Written
ML20024D513
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/28/1983
From: Stephens T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20024D513 (2)
Forwards LERs 83-058/03L-0 & 83-059/03L-0
ML20024D506
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/28/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20024D506 (1)