ML20024G276

From kanterella
Revision as of 07:00, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-22,changing Tech Specs to Contain Requirement That Initial Insp of Hydraulic Snubbers Be Performed within 6 Months from Date of Issuance of Tech Specs,In Response to NRC 750711 Request
Date released: 02/07/2020 Download: ML20024G276


Proposed Tech Specs Re Operability & Surveillance of Hydraulic Snubbers on Safety Related Sys
ML20024G679
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/15/1975
From:
NORTHERN STATES POWER CO.
To:
References
Download: ML20024G679 (8)
Application for Amend to License DPR-22,requiring That Initial Insp of Hydraulic Snubbers Be Performed within Six Months from Date of Issuance of Tech Spec
ML20024G280
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/15/1975
From: Wachter L
NORTHERN STATES POWER CO.
To:
References
Download: ML20024G280 (4)
Forwards Application for Amend to License DPR-22,changing Tech Specs to Contain Requirement That Initial Insp of Hydraulic Snubbers Be Performed within 6 Months from Date of Issuance of Tech Specs,In Response to NRC 750711 Request
ML20024G275
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/15/1975
From: Mayer L
NORTHERN STATES POWER CO.
To: GIAMBUSSO A
Office of Nuclear Reactor Regulation
References
Download: ML20024G275 (3)