ML20028F433

From kanterella
Revision as of 17:30, 26 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 82-084/03L-0
Date released: 02/11/2020 Download: ML20028F433


LER 82-084/03L-0:on 821223,sequencer Initiated Alarm Failed to Clear When Diesel Generator 12 Shut Down.Caused by Failure of Breaker Lever to Operate Auxiliary Switch in Cubicle Due to Displaced Assembly.New Assembly Installed
ML20028F439
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/21/1983
From: Basso L, Junge M
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20028F439 (2)
Forwards LER 82-084/03L-0
ML20028F432
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/21/1983
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: HAYNES R C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20028F432 (1)