ML20028C983

From kanterella
Revision as of 18:46, 19 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-42 Re Reactor Coolant Pump Pressure Top Nozzle Weld Leak Due to Overheating Stainless Alloy.Initially Reported on 820709.Final Rept Originally Scheduled for 821229 Delayed Until 830228
ML20028C983
Person / Time
Site: Palo Verde 
Issue date: 12/28/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22609-GHD, DER-82-42, NUDOCS 8301140372
Download: ML20028C983 (2)


Text

l Docket NosJ50-528/529/530

~

- f 50,[55 (c) L port -

1 Arizona Public Service Company-P,0, Oox 21666L . PHOENu, ARIZONA $5036 sfggy- dM.

iPi!13 December 28,198h ANPP-22609-GIID/BSK?/ U//y,f U. S. Nuclear Regulatory Commission Region;V Creekside Oaks Office Park 1450_.lfaria Lane - Suite.210 .

Walnut Creek, California 94596-5368 Attention: Mr. D. M..Sternberg, Chief~

Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82 A 50.55(e) Potentially Reportable Deficiency Relating to

. Unit.1 Reactor Coolant Pump Pressure Tap Nozzle Weld Leak Due To Overheating Stainless Alloy File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G.' Duckworth on July 9, 1982 (B) ANPP-21577 dated August'9, 1982 (C) ANPP-22204 dated November 4, 1982 (Time Extension)

Dear Sir:

The NRC;was notified of_a potentially reportab.a deficiency in Reference (A), an-Interim Report was transmitted by Reference (B),and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by December 29, 1982.

Due to the extensive evaluation required, it is now expected that this information will be finalized by February 28, 1983, when a complete report will be submitted.

There is no change to the Interim Report at this time.

Very truly yours, f C.L L % & w E. E. Van Brunt, Jr.

p I 372 82122g n APS Vice President S CK 050C0528 Nuclear Projects !!anagement PDR ANPP Project Director EEVBJr/GIID:db cc: See Attached Page 2

4 w, x > e a , , ..;e *.

1

.-~ . D. , . V

^

' _ a $ ' '

},

y; pa. - ,

,? a\ [

G U. S. Nuclear-Regulatory Cookiosion' ' ' December 28,'1982'

! Attention:- Mr. D. H.'Sternberg, Chief: 'ANPP-22609-GHD/BSK

'Page'2 cc: Richard-DeYoung,IDirector-Office of-Inspection and Enforcement

' q

-U. S. Nuclear Regulatory Commission-Washington,2D.'C.'20555 T. G. Woods,.Jr.

'J.'A. Roedel D. B. Fasnacht-G.[C. Andognini:

.J. R. Bynum-:

A. C. Rogers B. S. Kaplan

W. E. Ide J. Vorees

-J. A. Brand-A.~C. Gehr W.'J. Stubblefield W. G. Bingham-

-R. L. Patterson-E. W. Welcher

' R.11. Grant D. R. llawkJ nson L. E. Vorderbrueggen G. A. Florelli P. P. Klute Lynne Bernabel, Esq.

Ilarmon & Weiss 1725 "I" Street, NW .

Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General-Bataan Memorial Building Santa Fe, New Ilexico 87503