ML20024D977
| ML20024D977 | |
| Person / Time | |
|---|---|
| Site: | 05000128 |
| Issue date: | 06/21/1983 |
| From: | Urbanik T TEXAS A&M UNIV., COLLEGE STATION, TX |
| To: | Robinson P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20024D973 | List: |
| References | |
| NUDOCS 8308080657 | |
| Download: ML20024D977 (2) | |
Text
$ .
THE TEXAS A&M UNIVERSITY SYSTEM TEXAS TRANSPORTATION INSTITUTE
~
COLLEGE STATION TEXAS 77843-3135 TRANSPORT OPERATIONS PROC %M (713) g45.gs35 June 21, 1983 Perry D. Robinson ,_ -
U.S. Nuclear Regulatory Commission Ed ~ / - O Emergency Preparedness Branch Office of Inspection & Enforcement Washington, D.C. 20555
Dear Mr. Robinson:
A review of the Perry ETE dated July 1982 has been made using Appendix 4 of NUREG-0654, Revision 1. As indicated on the attached summary, two defi-ciencies were noted.
The Summer Sunday evacuation time estimate does not include an adverse weather estimate. Although a summer peak scenario with adverse weather is a remote possibility, wet roads due to a summer thunderstorm is nevertheless possible. It is, therefore, appropriate to have a Summer Sunday scenario con-sidering adverse weather (rain).
No reference in the report is made to having had the estimates reviewed by the appropriate state and local officials. A statement or reference to ,
state / local review is necessary to remove the deficiency regarding state and local review.
If you have any questions, please call me at (409) 845-1535.
Sincerely,
^Q.
Thomas Urbanik II Assistant Research Engineer TV/kab I l 8308080657 830729 PDR ADOCK 05000128 F PDR TRANSPORTATION RESEARCH ANO DEVELOPMENT
6 .
EVALUATION OF EVACUATION TIME ESTIMATE
, Perry Item Adequate Deficient Poor None
=
I. General A. Maps X B. Report Format 1 II. Demand Estimation A. Permanent Residents X B. Transient Populations X _ _
C. Special Facility Population X _
D. EPZ Sub-areas X III. Traffic Capacity A. Evacuation Roadway Network X B. Roadway Characteristics X C. Adverse Weather Considered X _
IV. Analysis A. Assumptions X _
B. Methodology X _,__
C. Carless X _
V. Other Requirements A. Confirmation Time X B. State and Local Review 1 VI. Overall X Date of Report: July, 1982 i
)
! l l
l
)