ML20024F146

From kanterella
Revision as of 06:00, 12 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Revised Emergency Plan Implementing Procedures EPIP 5.03 Re Personnel Accountability,Epip 5.04 Re Access Control & EPIP 5.05 Re Site Evacuation
ML20024F146
Person / Time
Site: Surry  
Issue date: 08/15/1983
From: Rentz F, Runner W, Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18141A096 List:
References
PROC-830815-01, NUDOCS 8309080261
Download: ML20024F146 (3)


Text

,

w smmo AUG 15 1983 r

VIRGINIA ELECTRIC AND POWER COMPANY

. SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 02 EPIP-5.03 PERSONNEL ACCOUNTABILITY PACE (With 1 Attachment) 1 of 7 PURPOSE

1. To determine the personnel who are inside the protected area and unaccounted for within 30 minutes following declaration of Site Emergency, or General Emergency.
2. To provide a periodically updated list of all pers(onnel inside the protected area.

USER Security Team Leader.

ENTRY CONDITIONS Any one of the following:

1. Activation by another EPlf; OR
2. Declaration of a Site Emergency, or General Emergency; QR
3. Any time deemed necessary by the Station Emergency Manager.

i REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 7, 2 of 7, 6 of 7 DATE:02-24-83 REV. 02 PAGE(S): 1 of 7, 2 of 7; Att. 1, pg. 1, 2 & 3 DATE:AUG 1 5 1583 REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

". PAGE(S): DATE:

MMENDED APPROVE DA TE APPROVA 0# '#

@ AUG 151983 CH IRHANSTA TION NUCLEAR SAFETY Y , r0 CPERA TING COMMITTEE 8309080261 830831 PDR ADOCK 05000280 -

F PDR

AUG 15 1333 g.;..n=

VIRGINIA ELECTRIC AND POWER COMPANY

-m

.; r i

/

NUMBER PROCEDURE TITLE REVISION 01

. EPIP-5.04 ACCESS CONTROL PAGE (k'ith 2 Attachments) 1 of 4 PURPOSE To insure that under emergency conditions only personnel with an emergency response function have access to the site.

USER Security Team Leaders. .

ENTRY C040lT10NS Any one of the following:

1. Activation by another EPIP; SE
2. Any time deemed necessary by the Station Emergency Manager; REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): Entire Procedure DATE: AU315 '383 REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

APPR 0 OA TE APPROVAL RE EO

' .y W AUG i 51983 0# #"'5# C IRMANSTA TION NUCLEAR SAFETY

$ AND OPERA TING COMMITTEE

e . o

' ~

AUG 13 G83 gs;ssnso l

VIRGINIA ELECTRIC AND POWER COMPANY

. SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE

' NUMBER PROCEDURE TITLE REVISION 1

! 02

! EPIP-5.05 SITE EVACUATION PACE (With No Attachments) 1 of 5

, PURPOSE Insure steps are taken to provide for a quick and orderly evacuation.

USER Station Emergency Manager E Emergency Administrative Director.

ENTRY CONDITIONS Any one of the following conditions exist:

1. Activation by another EPIP; E
2. Upon determining evacuation is imminent; E
3. At any time deemed necessary by the Station Emergency Manager.

REVISION RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 5, 3 of 5 DATE:02-24-83 REV. 02 PAGE(S): Entire Procedure DATE:AUG 1 5 1983 REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): DATE:

REV. PAGE(S): ' DATE:

C ENCEO APPROVE 0 QA TE APPROVAL M AUG 151983 OC REVIEk / \ C AIRMANSTATIONNUCLEARSAFETY ANO OPERA TING COMMITTEE

.. . . . . . .. .