ML20024F146

From kanterella
Jump to navigation Jump to search
Public Version of Revised Emergency Plan Implementing Procedures EPIP 5.03 Re Personnel Accountability,Epip 5.04 Re Access Control & EPIP 5.05 Re Site Evacuation
ML20024F146
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/15/1983
From: Rentz F, Runner W, Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18141A096 List:
References
PROC-830815-01, NUDOCS 8309080261
Download: ML20024F146 (3)


Text

,

AUG 15 1983 w smmo VIRGINIA ELECTRIC AND POWER COMPANY r

SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 02 EPIP-5.03 PERSONNEL ACCOUNTABILITY PACE (With 1 Attachment) 1 of 7 PURPOSE 1.

To determine the personnel who are inside the protected area and unaccounted for within 30 minutes following declaration of Site Emergency, or General Emergency.

To provide a periodically updated list of all pers(onnel inside the 2.

protected area.

USER Security Team Leader.

ENTRY CONDITIONS Any one of the following:

1.

Activation by another EPlf; OR 2.

Declaration of a Site Emergency, or General Emergency; QR 3.

Any time deemed necessary by the Station Emergency Manager.

i REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S):

1 of 7, 2 of 7, 6 of 7 DATE:02-24-83 REV. 02 PAGE(S):

1 of 7, 2 of 7; Att. 1, pg. 1, 2 & 3 DATE:AUG 1 5 1583 REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

PAGE(S):

DATE:

APPROVA MMENDED APPROVE DA TE AUG 151983 0#

CH IRHANSTA TION NUCLEAR SAFETY Y

r0 CPERA TING COMMITTEE 8309080261 830831 PDR ADOCK 05000280 F

PDR

AUG 15 1333 g.;..n=

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE

-m r

i

/

NUMBER PROCEDURE TITLE REVISION 01 EPIP-5.04 ACCESS CONTROL PAGE (k'ith 2 Attachments) 1 of 4 PURPOSE To insure that under emergency conditions only personnel with an emergency response function have access to the site.

USER Security Team Leaders.

ENTRY C040lT10NS Any one of the following:

1.

Activation by another EPIP; SE 2.

Any time deemed necessary by the Station Emergency Manager; REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): Entire Procedure DATE: AU315 '383 REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

APPROVAL RE EO APPR 0

OA TE

.y W AUG i 51983 0# #"'5#

C IRMANSTA TION NUCLEAR SAFETY AND OPERA TING COMMITTEE

o e

' ~

AUG 13 G83 gs;ssnso l

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 1

02 EPIP-5.05 SITE EVACUATION PACE (With No Attachments) 1 of 5 PURPOSE Insure steps are taken to provide for a quick and orderly evacuation.

USER Station Emergency Manager E Emergency Administrative Director.

ENTRY CONDITIONS Any one of the following conditions exist:

1.

Activation by another EPIP; E

2.

Upon determining evacuation is imminent; E

3.

At any time deemed necessary by the Station Emergency Manager.

REVISION RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S):

1 of 5, 3 of 5 DATE:02-24-83 REV. 02 PAGE(S):

Entire Procedure DATE:AUG 1 5 1983 REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

' DATE:

APPROVAL C

ENCEO APPROVE 0 QA TE M

AUG 151983 OC REVIEk

/

\\

C AIRMANSTATIONNUCLEARSAFETY ANO OPERA TING COMMITTEE

.