MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
NYS000069 United States Nuclear Regulatory Commission Official Hearing Exhibit Submitted: December 14, 2011 Entergy Nuclear Operations, Inc. EXCERPT In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3) c.\.\.P.R REGlI(.q" ASLBP #: 07-858-03-LR-BD01 l~';
Docket #: 05000247 l 05000286
" 03:
Exhibit #: NYS000069-00-BD01 Identified: 10/15/2012
'"~ ~ Admitted: 10/15/2012 Withdrawn:
........1-:
i 0.... Rejected: Stricken:
" --***"" " Other:
Integration of Wind into System Dispatch A New York ISO White Paper October 2008 OAGI0000665_00001
- 1. Introduction Wind power is growing as a generation resource in New York State. The number of wind plants operating in the state has increased significantly over the past two years.
Wind-powered projects also comprise a dominant portion of the proposed new generation projects in the New York Independent System Operator's (NYISO) interconnection queue.
Wind capacity in New York is projected to grow to more than 1,200 MW by the summer of 2009. The projects currently under review in the interconnection queue indicate the potential for another 6,500 MW of wind capacity to be developed by 2011.
Due to the location of these resources and their intermittent nature, this presents a new challenge for grid and market operations in New York. Many of the proposed wind plants are seeking to interconnect in concentrated clusters located in the northern and western regions of the state. These regions are supported by an existing transmission network that will not be capable of delivering all the potential wind output to the load centers in the southeastern regions of the state.
The expected level of wind penetration as well as the concentration or clustering of the wind plants in areas of the grid not built to accommodate that level of generation may require that wind output be re-dispatched when system security and reliability is threatened. Dispatching other resources around wind plant output may not alone be adequate to efficiently manage the expected levels of wind generation in New York.
Long-term solutions may include the need for additional transmission to move wind power, energy storage devices to absorb excess power in off-peak hours, and new operational rules to protect system security.
To enhance the integration of existing wind plants and prepare for the influx of additional wind generation, the NYISO has taken the following steps:
Funded and participated in the 2005 study, The Effects of Integrating Wind Power on Transmission System Planning, Reliability and Operations, sponsored by the New York State Energy Research and Development Authority (NYSERDA)
Expanded the eligibility of intermittent resources for special market rules from 500 MW to 3,300 MW to accommodate increased penetration levels of wind plants on the system Initiated a centralized wind forecasting system integrating wind generation into the NYISO day-ahead and real-time market software systems in order to better predict the output of wind projects in the NYISO' s system dispatch.
The NYISO can best optimize wind plant output by evaluating each plant's economic preferences within the NYISO's real-time Security Constrained Economic Dispatch (SCED) process, as it does other generating resources. If the wind plant's economic offers are not known, the NYISO or local system operators must take less efficient, out-of-market actions to protect the reliability of the system. Therefore, the NYISO proposes to extend its market-based SCED systems to optimize the scheduling of wind plants.
Integration of Wind Into System Dispatch 1-1 New York Independent System Operator, October 2008 OAGI0000665_00004
- 5. Longer-term Wind Integration Solutions Greater integration of wind resources into the NYISO's economic dispatch will allow for increased wind penetration into New York. Just meeting New York State's 25%
renewable energy mandate may require as much as 4,000 MW of wind capacity to be built in New York.12 Further, wind plants are being developed in New York in order to sell energy as part of the renewable energy programs in place in neighboring states. It is therefore possible that New York's wind plant capacity may exceed 4,000 MW. With wind plants continuing to locate in the northern and western portions of the state it will become difficult to meet state RPS targets without additional transmission infrastructure to balance and move the wind energy southeast to the larger load centers. In the long-term, increasing the amount of wind that can be reliably integrated into the bulk power system and delivered to the load may require new operating procedures, market rules, new storage technologies, as well as transmission reinforcements.
Enhanced Centralized Wind Forecasting The NYISO is concerned with high-speed wind events such as the one depicted in Figure 111-1 due to the reliability implications resulting from the intermittent characteristics of wind turbines during such events. The geographic concentration of wind plants under development in the north and west regions of the state may impact the NYISO's ability to meet NERC's Balancing Authority reliability rules due to these high-speed wind events.
As a result, the NYISO is evaluating potential steps to enhance its Centralized Wind Forecasting System in order to effectively predict the occurrence of such events and minimize the resulting impacts on the system.
Impact on Reserves and Regulation Requirements A significant increase in intermittent resources in New York may increase the need for regulation and reserves services to maintain system reliability. For example, a recent wind study by the California Independent System Operator (CAISO) concluded that increased wind generation will increase the requirement for regulation, due to near-term wind forecast uncertainty. 13 The requirement for regulation in the past has been mainly a function of the variability of electrical load. Wind plants may create a significant demand for increased regulation and reserves, thus making it imperative to look for new sources and new technologies for these services.
The NYISO is currently evaluating changes to its market rules and scheduling tools to better accommodate energy storage technologies, such as flywheels or batteries, into the regulation markets. These types of devices have limited energy storage, but they have a fast dynamic response rate that allows them to quickly switch from absorbing to injecting real power into the transmission system, and thereby provide frequency regulation and short-duration Area Control Error (ACE) regulation.
12This is based on Combined Targets of 12.3 million MWh, with an assumed a 30% capacity factor for wind resources, and 25% non-wind new RPS resources. Source for Combined Targets: New York State Renewable Portfolio Standard Performance Report, August 2007. NYSERDA 13 Integration of Renewable Resources, California ISO, November 2007.
Integration of Wind Into System Dispatch 5-1 New York Independent System Operator, October 2008 OAGI0000665_00016