MONTHYEARML24284A0382024-10-22022 October 2024 Public Meetings to Receive Comments on the Draft Perry Plant EIS Meetings Summary Memo ML23303A0662023-11-0606 November 2023 October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary Memo ML23129A6062023-05-0404 May 2023 Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML22019A2652022-01-27027 January 2022 Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B ML21096A2282021-03-30030 March 2021 FEMA Disapproval of Davis-Besse Exercise Exemption ML20163A6272020-06-15015 June 2020 Summary of Public Telecon with Energy Harbor on License Renewal for Perry Nuclear Plant ML20080J7892020-04-28028 April 2020 Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19162A0302019-06-0707 June 2019 Memorandum to File Environmental Assessment and Finding of No Significant Impact for Firstenergy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Perry ISFSI ML19161A3302019-06-0707 June 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for First Energy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Beaver Valley ISFSI ML19162A0102019-06-0707 June 2019 Memorandum to File Environmental Assessment and Finding of No Significant Impact for Firstenergy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Davis Besse ISFSI ML19085A5132019-04-0101 April 2019 Review of Updated Final Safety Analysis Report, Revision 23 ML18254A3982018-10-0101 October 2018 Fleet Nuclear Power Plant Adoption of Technical Specifications Task Force Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement (EPID No. 05000440/L-2018-LLA-0167) ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML18067A1132018-03-0909 March 2018 Notice of Public Meeting on March 27, 2018 ML17061A2072017-03-0707 March 2017 Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 ML17004A2952017-01-0505 January 2017 Safety Evaluation Report- Application for Amendment Perry Nuclear Power Plant ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML16180A1352016-06-22022 June 2016 Summary of Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-of-Cycle Performance Assessment of Perry Nuclear Power Plant ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15205A1692015-08-0707 August 2015 ACRS Review of the Davis Besse Nuclear Plant LRA - Transmittal of the Sser ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML14296A6892014-11-10010 November 2014 Summary of September 18, 2014, Meeting with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change ML14195A0742014-07-14014 July 2014 Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936) IR 05000334/20004122014-07-0808 July 2014 NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote ML14189A1212014-07-0808 July 2014 NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues ML14189A1192014-07-0808 July 2014 NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues ML14161A1482014-06-17017 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML13280A9062013-10-21021 October 2013 Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Voluntary Risk Informed Fire Protection Amendment for Davis-Besse ML13282A6462013-10-0909 October 2013 Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel ML13186A0382013-07-0808 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report ML13142A5122013-07-0202 July 2013 Summary of Telephone Conference Call Held on May 21, 2013, Between NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13179A3182013-07-0101 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports ML13171A2922013-06-13013 June 2013 LTR-13-0540 - Bill Hawkins and Vinod Arora Email San Onofre Nuclear Generating Station (SONGS) Lessons Learn for Davis-Besse ML13154A4442013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Davis-Besse and Perry ML13154A4392013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2 ML13004A4032013-01-0404 January 2013 Memo - Request for a Deviation from the Reactor Oversight Process Action Matrix for Perry Nuclear Power Plant ML12265A2032012-10-0202 October 2012 Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12263A4202012-09-20020 September 2012 Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment Request ML12207A5672012-07-26026 July 2012 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5 ML12199A2072012-07-17017 July 2012 Public Meeting Notice to Discuss the 2011 End-of-Cycle Performance Assessment ML12194A5622012-07-16016 July 2012 Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal 2024-10-22
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23188A0982023-07-17017 July 2023 – Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 – Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 – Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS – Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22235A7672022-09-0101 September 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22096A3162022-04-12012 April 2022 Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) 2024-09-13
[Table view] |
Text
July 16, 2015 MEMORANDUM TO: Benjamin G. Beasley, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Anthony Bowers, Chief /RA VRodriguez For/
Financial Analysis and International Projects Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation SUJECT: ANNUAL FINANCIAL TEST FOR A PARENT COMPANY GUARANTEE GIVEN BY FIRSTENERGY SOLUTIONS CORPORATION AND FIRSTENERGY CORPORATION The Financial Analysis and International Projects Branch has completed the annual assessment of the Parent Company Guarantee provided by FirstEnergy Corporation and FirstEnergy Solutions Corporation in compliance with Title 10 of the Code of Federal Regulations (10 CFR)
Part 30, Appendix A.
This effort was done in association with the current Biennial Decommissioning Funding Report Review under TACs MF5933, MF5954, and MF5997. These TACs will be closed upon the conclusion of the current Biennial Decommissioning Funding Report Review.
If you have any questions regarding this review please feel free to contact Michael A. Dusaniwskyj at 301-415-1260.
Docket Nos. 50-334 72-1043 72-014 50-440 72-69 CONTACT: Michael A. Dusaniwskyj, NRR/DIRS 301-415-1260
ML15182A191 OFFICE NRR/DIRS/IFIB NRR/DIRS/IFIB NAME MDusaniwskyj ABowers (VRodriguez For)
DATE 07/01/2015 07/16/2015 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ANNUAL FINANCIAL TEST FOR A PARENT COMPANY GUARANTEE GIVEN BY FIRSTENERGY SOLUTIONS CORPORATION AND FIRSTENERGY CORPORATION BEAVER VALLEY POWER STATION, UNIT No. 1; DOCKET 50-334 BEAVER VALLEY POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI); DOCKET No. 72-1043 DAVIS-BESSE NUCLEAR POWER STATION ISFSI; DOCKET No. 72-14 PERRY NUCLEAR POWER PLANT; DOCKET No. 50-440 PERRY NUCLEAR POWER PLANT ISFSI; DOCKET No. 72-69
1.0 INTRODUCTION
By letter dated March 31, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. M15090A441), FirstEnergy Nuclear Operating Company (FENOC) provided data to support the U.S. Nuclear Regulatory Commissions (NRCs) the annual financial test in support of its corporate subsidiaries, (FirstEnergy Corporation and FirstEnergy Solutions Corporation) Parent Company Guarantee (PCG) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 30, Appendix A, Criteria Relating to Use of Financial Tests and Parent Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning. In addition, 10 CFR Part 30, Appendix A(C)(1) states that after the initial financial test, the parent company must repeat the passage of the test within 90 days after the close of each succeeding fiscal year.
The Ohio Edison Company and The Toledo Edison Company obtained a PCG from their parent, FirstEnergy Corporation (FE), for obligations associated with the decommissioning of the Beaver Valley Power Station and its associated Independent Spent Fuel Storage Installation (ISFSI), and the Perry Nuclear Power Plant ISFSI. The FirstEnergy Nuclear Generation LLC, obtained two PCGs from its parent, FirstEnergy Solutions Corporation, for its decommissioning obligations; one PCG is for the decommissioning obligations associated with Beaver Valley Power Station, Unit 1, and Perry Nuclear Power Plant. The second PCG is associated with Beaver Valley Power Station ISFSI, Davis-Besse Nuclear Power Station ISFSI, and the Perry Nuclear Power Plant ISFSI.
The financial test provides assurance that FirstEnergy Solutions Corporation can continue maintaining $175.5 million in PCG coverage for decommissioning funding assurance for the units as listed below. The $175.5 million figure is the total value combination of five separate PCG:
Enclosure
2 UNIT Parent Company Guarantee Beaver Valley Power Station, Unit No. 1 $90,000,000 Perry Nuclear Power Plant $65,000,000 Davis-Besse Nuclear Power Station ISFSI $ 6,000,000 Perry Nuclear Power Plant ISFSI $ 7,500,000 Beaver Valley Power Station ISFSI $ 7,000,000 TOTAL: $175,500,000 Another financial test provides assurance that FirstEnergy Corporation can continue maintaining
$4.0 million in PCG coverage for decommissioning funding assurance for the units as listed below. The $4.0 million figure is the total combined value of two separate PCGs:
UNIT Parent Company Guarantee Perry Nuclear Power Plant $1,750,000 Beaver Valley Power Station ISFSI $2,250,000 TOTAL: $4,000,000
2.0 ANALYSIS
In its March 31, 2015, submittal, FirstEnergy Corporation and FirstEnergy Solutions Corporation conducted the financial test in accordance with 10 CFR Part 30, Appendix A, Section II(A)(2).
Both FirstEnergy Corporation and FirstEnergy Solutions Corporation provided all the necessary information associated with the test including a report of its Independent Accountants, PricewaterhouseCoopers LLP.
Fundamental to the financial test is the determination that FirstEnergy Corporation and FirstEnergy Solutions Corporation each have tangible net worth that is at least six times the value of the PCG obligations. FirstEnergy Corporation has a tangible net worth of
$3,017 million against total PCG of $4.0 million rendering a ratio of 754, which is greater than 6 which is the minimum required in the financial test. FirstEnergy Solutions Corporation has a tangible net worth of $1,444 million against total PCG of $175.5 million rendering a ratio of 8, which is greater than 6, which is the minimum required in the financial test.
3.0 CONCLUSION
The NRC staff finds that FirstEnergy Corporation and FirstEnergy Solutions Corporation each have complied with the requirements of 10 CFR Part 30, Appendix A, and specifically provided the information required in 10 CFR Part 30 Appendix A(C)(1). The NRC staff also finds that FirstEnergy Corporation and FirstEnergy Solutions Corporation have submitted the necessary information within 90 days after the close of the succeeding fiscal year. FirstEnergy Corporation and FirstEnergy Solutions Corporation successfully repeated the annual passage of the test.
Principal Contributor: Michael A. Dusaniwskyj Date: July 1, 2015