LIC-16-0082, Summary of Emergency Planning Changes

From kanterella
Revision as of 23:09, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Emergency Planning Changes
ML16278A640
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/09/2016
From: Blome B
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-16-0082
Download: ML16278A640 (3)


Text

-~

Omaha Public Power District

'\

September 9, 2016 LIC-16-0082

~

10 CFR 50.54(q) 10 CFR 50.4{b)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

SUBJECT:

Emergency Planning Changes In accordance with 10 CFR 50.54(q), the Omaha Public Power District submits a report of each such change made including a summary of its analysis. This change was reviewed and does not constitute a reduction in effectiveness.

No commitments are made in this letter.

If you have any questions regarding the enclosed changes, please contact Mr. Eric Plautz at 402-533-7308.

~*=-

Bradley H. Blome Manager - Site Regulatory Assurance BHB/mec Enclosure c: K. M. Kennedy, NRC Regional Administrator, Region IV C.F. Lyon, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector Fort Calhoun Station, PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane, Blair, NE 68008

EP-1 Page 13of13 Confirmation of Transmittal for Rev. 9 Emergency Planning Documents/Information Emergency Plan Emergency Planning Forms Radiological Emergency D Response Plan (RERP)

[2J Implementing Procedures D (EPF)

(EPIP)/(EP-FC-110 thru 115, 1001)

D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ Information (EPDM)

Date:

Transmitted to:

Name: Document Control Desk Copy No: 165 Date:

Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) I information are forwarded for your manual:

REMOVE SECTION INSERT SECTION EP-FC-112-700-F-03 REV 0 ISSUED 5/15/15 EP-FC-112-700-F-03 REV 1 ISSUED 9/1/2016 EP-FC-112-700-F-04 REV 1 ISSUED 6/02/15 EP-FC-112-700-F-04 REV 2 ISSUED 9/1/2016 EP-FC-112-700-F-05 REV 1 ISSUED 6/02/15 EP-FC-112-700-F-05 REV 2 ISSUED 9/1/2016 Summary of Changes' Plea"' see the e n c

  • a o g e s .

Managif- Emergency Planning I hereby acknowledge receipt of the above documents1information and have included them in my assigned manuals.

Signature: Date:

Please sign above and return by: 10/31/16 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below.

D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to:

Name: Mailing Address:

Summary of Changes EP-FC-112-700-F-03 EP-FC-112~700-F-04 EP-FC-112-700-F-05 The changes to these Alternative Facilities procedures are to update position checklists and documents to refer to the new integration procedure numbers. This is an editorial change only as the procedure titles and numbers that are referenced are being corrected; the step numbering has changed slightly but achieve the same intent and purpose of the previously issued procedure revision. There has been no change to the Emergency Plan, so there continues to be regulatory compliance. Revising the checklist to direct personnel to the current procedure number and title in no way reduces the effectiveness of the Emergency Plan.