Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 9/25/2018
ML18253A193
Person / Time
Issue date: 09/14/2018
From: Kathryn Brock
Division of Operating Reactor Licensing
To:
Goldstein K, 415-1506
References
NRC-2018-0208
Download: ML18253A193 (27)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[NRC-2018-0208]

Biweekly Notice Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations AGENCY: Nuclear Regulatory Commission.

ACTION: Biweekly notice.

SUMMARY

Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person.

This biweekly notice includes all notices of amendments issued, or proposed to be issued, from August 28, 2018 to September 10, 2018. The last biweekly notice was published on September 11, 2018.

DATES: Comments must be filed by October 25, 2018. A request for a hearing must be filed by November 26, 2018.

ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):

Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:

Jennifer.Borges@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document.

  • Mail comments to: May Ma, Office of Administration, Mail Stop: TWFN A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-1506, e-mail: Kay.Goldstein@nrc.gov SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2018-0208 facility name, unit number(s), plant docket number, application date, and subject when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:

  • NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 2

301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.

  • NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments Please include Docket ID NRC-2018-0208, facility name, unit number(s), plant docket number, application date, and subject in your comment submission.

The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.

If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.

3

II. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Combined Licenses and Proposed No Significant Hazards Consideration Determination.

The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration. Under the Commissions regulations in § 50.92 of title 10 of the Code of Federal Regulations (10 CFR), this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below.

The Commission is seeking public comments on this proposed determination.

Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination.

Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example in derating or shutdown of the facility. If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. If the Commission makes a final no significant hazards consideration determination, any 4

hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently.

A. Opportunity to Request a Hearing and Petition for Leave to Intervene Within 60 days after the date of publication of this notice, any persons (petitioner) whose interest may be affected by this action may file a request for a hearing and petition for leave to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commissions Agency Rules of Practice and Procedure in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309. The NRCs regulations are accessible electronically from the NRC Library on the NRCs Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of the regulations is available at the NRCs Public Document Room, located at One White Flint North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued.

As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) the name, address, and telephone number of the petitioner; (2) the nature of the petitioners right under the Act to be made a party to the proceeding; (3) the nature and extent of the petitioners property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioners interest.

In accordance with 10 CFR 2.309(f), the petition must also set forth the specific contentions which the petitioner seeks to have litigated in the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner must provide a brief explanation of the bases for 5

the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to the specific sources and documents on which the petitioner intends to rely to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. Contentions must be limited to matters within the scope of the proceeding. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at least one contention will not be permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene. Parties have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that partys admitted contentions, including the opportunity to present evidence, consistent with the NRCs regulations, policies, and procedures.

Petitions must be filed no later than 60 days from the date of publication of this notice. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document.

If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to establish when the hearing is held. If the final 6

determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.

A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioners interest in the proceeding. The petition should be submitted to the Commission no later than 60 days from the date of publication of this notice. The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or Federally-recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries.

Alternatively, a State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c).

If a hearing is granted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a).

A person making a limited appearance may make an oral or written statement of his or her position on the issues but may not otherwise participate in the proceeding. A limited 7

appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled.

B. Electronic Submissions (E-Filing)

All documents filed in NRC adjudicatory proceedings, including a request for hearing and petition for leave to intervene (petition), any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities that request to participate under 10 CFR 2.315(c), must be filed in accordance with the NRCs E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562; August 3, 2012). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Detailed guidance on making electronic submissions may be found in the Guidance for Electronic Submissions to the NRC and on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.

To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID 8

certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.

Information about applying for a digital ID certificate is available on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit adjudicatory documents. Submissions must be in Portable Document Format (PDF). Additional guidance on PDF submissions is available on the NRCs public Web site at http://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRCs Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed so that they can obtain access to the documents via the E-Filing system.

A person filing electronically using the NRCs adjudicatory E-Filing system may seek assistance by contacting the NRCs Electronic Filing Help Desk through the Contact Us link located on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html, by e-mail to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-9

672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m.,

Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing adjudicatory documents in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.

Documents submitted in adjudicatory proceedings will appear in the NRCs electronic hearing docket which is available to the public at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the Commission or the presiding officer. If you do not have an NRC-issued digital ID certificate as described above, click cancel when the link requests certificates and you will be automatically directed to the NRCs electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include 10

personal privacy information, such as social security numbers, home addresses, or personal phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. For example, in some instances, individuals provide home addresses in order to demonstrate proximity to a facility or site. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.

For further details with respect to these license amendment applications, see the application for amendment which is available for public inspection in ADAMS and at the NRCs PDR. For additional direction on accessing information related to this document, see the Obtaining Information and Submitting Comments section of this document.

Southern Nuclear Operating Company, Inc., Docket Nos. 50-348 and 50-364, Joseph M.

Farley Nuclear Plant, Units 1 and 2, Houston County, Alabama, Date of amendment request: July 27, 2018. A publicly-available version is in ADAMS under Accession No. ML18208A619.

Description of amendment request: The proposed amendment would modify Technical Specification requirements to permit use of Risk Informed Completion Times in accordance with NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines.

Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:

1. Does the proposed amendment [change] involve a significant increase in the probability or consequences of an accident previously evaluated?

11

Response: No.

The proposed change permits the extension of completion times provided risk is assessed and managed within the Risk Informed Completion Time Program. The proposed change does not involve a significant increase in the probability of an accident previously evaluated because the changes involve no change to the plant or its mode of operation. The proposed change does not increase the consequences of an accident because the design-basis mitigation function of the affected systems is not changed and the consequences of an accident during the extended completion time are no different from those during the existing COMPLETION TIME.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed TS revision does not change the design, configuration, or method of plant operation. The proposed change does not involve a physical alteration of the plant in that no new or different kind of equipment will be installed.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change permits the extension of completion times provided risk is assessed and managed within the Risk Informed Completion Time Program. The proposed change implements a risk-informed configuration management program to assure that adequate safety margins are maintained. Application of these new specifications and the configuration management program considers cumulative effects of multiple systems or components being out of service and does so more effectively than the current TS.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

The NRC staff has reviewed the licensees analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC 12

staff proposes to determine that the amendment request involves no significant hazards consideration.

Attorney for licensee: Millicent Ronnlund, Vice President and General Counsel, Southern Nuclear Operating Company, Inc., P. O. Box 1295, Birmingham, AL 35201-1295.

Southern Nuclear Operating Company, Docket Nos.52-025 and 52-026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia Date of amendment request: July 19, 2018. A publicly-available version is in ADAMS under Accession No. ML18200A415.

Description of amendment request: The amendment request proposes changes to combined license Appendix C (and plant-specific design control document Tier 1) to revise Inspections, Tests, Analysis, and Acceptance Criteria (ITAAC) related to flow testing of low pressure makeup from the cask loading pit to the reactor coolant system via the normal residual heat removal system (RNS) and RNs pump testing at reduced inventory.

Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed changes to the RNS ITAAC revise the acceptance criteria for flow testing of low pressure makeup from the CLP [cask loading pit] to the RCS [reactor coolant system] (via RNS) and clarify the acceptance criteria for RNS pump flow testing at reduced inventory. The proposed changes do not have any adverse effects on the design functions of the RNS. The 13

probabilities of accidents evaluated in the UFSAR [Updated Safety Analysis Report] are not affected.

The changes do not adversely impact the support, design, or operation of mechanical and fluid systems. The changes do not impact the support, design, or operation of any safety-related structures. There is no change to the plant systems or response of systems to postulated accident conditions. There is no change to the predicted radioactive releases due to normal operation or postulated accident conditions. The plant response to previously evaluated accidents or external events is not adversely affected, nor do the proposed changes create any new accident precursors.

Therefore, the requested amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed changes to the RNS ITAAC revise the acceptance criteria for flow testing of low pressure makeup from the CLP to the RCS (via RNS) and clarify the acceptance criteria for RNS pump flow testing at reduced inventory. The proposed changes do not have any adverse effects on the design function of the RNS, the structures and systems in which the RNS is used, or any other SSC [structure system or component] design functions or methods of operation that result in a new failure mode, malfunction, or sequence of events that affect safety-related or non-safety related equipment. This activity does not allow for a new fission product release path, result in a new fission product barrier failure mode, or create a new sequence of events that result in significant fuel cladding failures.

Therefore, the requested amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No.

The proposed changes to the RNS ITAAC revise the acceptance criteria for flow testing of low pressure makeup from the CLP to the RCS (via RNS) and clarify the acceptance criteria for RNS pump flow testing at reduced inventory.

14

Because no safety analysis or design basis acceptance limit/criterion is challenged or exceeded by these changes, no significant margin of safety is reduced. Therefore, the proposed changes do not involve a significant reduction in a margin of safety.

The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied.

Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.

Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.

NRC Branch Chief: Jennifer Dixon-Herrity.

Southern Nuclear Operating Company, Docket Nos.52-025 and 52-026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia Date of amendment request: August 10, 2018. A publicly-available version is in ADAMS under Accession No. ML18222A254.

Description of amendment request: The requested amendment proposes changes to Combined License Appendix A, Technical Specifications, to change Technical Specifications Limiting Condition for Operation (LCO) 3.1.8, Physics Tests Exception -

Mode 2, related to Functions of LCO 3.3.1, Reactor Trip System (RTS)

Instrumentation, for which the required number of channels may be reduced from 4 channels to 3 channels, to include Function 4. Additionally, for LCO 3.8.3, Inverters -

Operating, the request proposes to make an editorial nomenclature change from constant voltage source transformer to voltage regulating transformer.

15

Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed changes do not involve changes to current plant design or safety analysis assumptions. These changes provide Technical Specifications consistency with the approved plant design and safety analysis assumptions. The changes do not affect the operation of any systems or equipment that initiate an analyzed accident or alter any structures, systems, and components (SSCs) accident initiator or initiating sequence of events. The proposed changes do not adversely impact the ability of any SSCs provided for, or credited in, mitigating any analyzed accident. Therefore, the requested amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed changes do not involve changes to current plant design or safety analysis assumptions. These changes provide Technical Specifications consistency with the approved plant design and safety analysis assumptions. The proposed changes do not adversely affect plant protection instrumentation systems, and do not affect the design function, support, design, or operation of mechanical and fluid systems.

The proposed changes do not result in a new failure mechanism or introduce any new accident precursors. No design function described in the Updated Final Safety Analysis Report (UFSAR) is affected by the proposed changes. Therefore, the requested amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No.

The proposed changes do not involve changes to current plant design or safety analysis assumptions. These changes provide Technical Specifications consistency with the approved plant design and safety analysis assumptions. No safety analysis or design basis acceptance 16

limit/criterion is involved. Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.

The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.

Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.

NRC Branch Chief: Jennifer Dixon-Herrity.

Southern Nuclear Operating Company, Inc., Docket Nos.: 52-025 and 52-026, Vogtle Electric Generating Plant (VEGP) Units 3 and 4, Burke County, Georgia Date of amendment request: August 3, 2018. A publicly-available version is in ADAMS under Accession No. ML18215A382.

Description of amendment request: The requested amendment requires changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD) Tier 2* and Tier 2 information and related changes to the VEGP Units 3 and 4 Combined License (COL) and COL Appendix C (and corresponding plant-specific DCD Tier 1) information.

Specifically, the requested amendment includes changes to credit previously completed first plant only and first three plant only testing as described in the licensing basis documents, including COL Condition 2.D.(2)(a) and plant-specific Tier 1 Section 2.1.3.

In particular, the proposed changes would revise the COL to delete conditions requiring the following tests: In-Containment Refueling Water Storage Tank (IRWST) Heatup Test, Reactor Vessel Internals Vibration Testing, and Core Makeup Tank (CMT) Heated 17

Recirculation Tests. The documentation to establish a valid prototype reactor internals in accordance with Regulatory Guide 1.20 is also included.

Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed change does not affect the operation of any systems or equipment that initiates an analyzed accident or alter any structures, systems, or components (SSC) accident initiator or initiating sequence of events. The proposed changes remove first plant and first three plant only tests including the IRWST heatup test, reactor vessel internals vibration testing, and CMT recirculation tests based on the successful completion of the tests at the lead AP1000 units. The change does not adversely affect any methodology which would increase the probability or consequences of a previously evaluated accident.

The change does not impact the support, design, or operation of mechanical or fluid systems. There is no change to plant systems or the response of systems to postulated accident conditions.

There is no change to predicted radioactive releases due to normal operation or postulated accident conditions. The plant response to previously evaluated accidents or external events is not adversely affected, nor does the proposed change create any new accident precursors.

Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of a previously evaluated accident.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change does not affect the operation of any systems or equipment that may initiate a new or different kind of accident, or alter any SSC such that a new accident initiator or initiating sequence of events is created.

18

The proposed change credits previously completed first plant and first three plant only tests including the IRWST heatup test, reactor vessel internals vibration testing, and CMT recirculation tests based on the successful completion of the tests at the lead AP1000 units. The proposed changes do not adversely affect any design function of any SSC design functions or methods of operation in a manner that results in a new failure mode, malfunction, or sequence of events that affect safety-related or non-safety-related equipment. This activity does not allow for a new fission product release path, result in a new fission product barrier failure mode, or create a new sequence of events that result in significant fuel cladding failures.

Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No.

The proposed change maintains existing safety margin and provides adequate protection through continued application of the existing requirement in the UFSAR. The proposed change satisfies the same design functions in accordance with the same codes and standards as stated in the UFSAR. This change does not adversely affect any design code, function, design analysis, safety analysis input or result, or design/safety margin. No safety analysis or design basis acceptance limit/criterion is challenged or exceeded by the proposed change.

Since no safety analysis or design basis acceptance limit/criterion is challenged or exceeded by this change, no significant margin of safety is reduced.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.

Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham LLP, 1710 Sixth Avenue North Birmingham, AL 35203-2015.

19

NRC Branch Chief: Jennifer Dixon-Herrity.

III. Notice of Issuance of Amendments to Facility Operating Licenses and Combined Licenses During the period since publication of the last biweekly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations. The Commission has made appropriate findings as required by the Act and the Commissions rules and regulations in 10 CFR chapter I, which are set forth in the license amendment.

A notice of consideration of issuance of amendment to facility operating license or combined license, as applicable, proposed no significant hazards consideration determination, and opportunity for a hearing in connection with these actions, was published in the Federal Register as indicated.

Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated.

For further details with respect to the action see (1) the applications for amendment, (2) the amendment, and (3) the Commissions related letter, Safety Evaluation and/or Environmental Assessment as indicated. All of these items can be 20

accessed as described in the Obtaining Information and Submitting Comments section of this document.

Energy Northwest, Docket No. 50-397, Columbia Generating Station, Benton County, Washington Date of amendment request: December 12, 2017.

Brief description of amendment: The amendment revised Technical Specification (TS) 3.6.4.1, Secondary Containment. The changes are based on Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.

Date of issuance: September 6, 2018.

Effective date: As of its date of issuance and shall be implemented within 60 days from the date of issuance.

Amendment No.: 250. A publicly-available version is in ADAMS under Accession No. ML18221A107; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.

Renewed Facility Operating License No. NPF-21: The amendment revised the Renewed Facility Operating License and Technical Specifications.

Date of initial notice in Federal Register: March 13, 2018 (83 FR 10915).

The Commissions related evaluation of the amendment is contained in a Safety Evaluation dated September 6, 2018.

No significant hazards consideration comments received: No.

Exelon Generation Company, LLC, Docket No. 50-244, R. E. Ginna Nuclear Power Plant, Wayne County, New York 21

Date of amendment request: October 31, 2017.

Brief description of amendment: The amendment revised Technical Specification (TS)

Surveillance Requirement 3.8.4.3, DC [Direct Current] Sources - MODES 1, 2, 3, and 4, to allow for a modified performance discharge test.

Date of issuance: August 31, 2018.

Effective date: As of the date of issuance and shall be implemented within 60 days of issuance.

Amendment No.: 130. A publicly-available version is in ADAMS under Accession No. ML18214A176; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.

Renewed Facility Operating License No. DPR-18: Amendment revised the Renewed Facility Operating License and TS.

Date of initial notice in Federal Register: January 2, 2018 (83 FR 168).

The Commissions related evaluation of the amendment is contained in a Safety Evaluation dated August 31, 2018.

No significant hazards consideration comments received: No.

Nebraska Public Power District, Docket No. 50-298, Cooper Nuclear Station (CNS),

Nemaha County, Nebraska Date of amendment request: May 10, 2018.

Brief description of amendment: The amendment modified CNS Technical Specification 2.1.1.2 by revising the values of the safety limit minimum critical power ratio for two recirculation loop operation and for single recirculation loop operation to reflect the results of a cycle-specific calculation.

Date of issuance: September 6, 2018.

22

Effective date: As of the date of issuance and shall be implemented prior to startup from Refuel Outage 30.

Amendment No.: 261. A publicly-available version is in ADAMS under Accession No. ML18218A483; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.

Renewed Facility Operating License No. DPR-46: The amendment revised the Renewed Facility Operating License and Technical Specifications.

Date of initial notice in Federal Register: July 2, 2018 (83 FR 30984).

The Commissions related evaluation of the amendment is contained in a Safety Evaluation dated September 6, 2018.

No significant hazards consideration comments received: No.

Southern Nuclear Operating Company, Inc., Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, City of Dalton, Georgia, Docket Nos. 50-321 and 50-366, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, Appling County, Georgia Date of amendment request: July 10, 2017. A publicly-available version is in ADAMS under Accession No. ML17191B163.

Brief description of amendments: The amendments revise the Technical Specifications (TSs) by: (1) adding a Note to the Surveillance Requirements (SRs) of TS 3.7.7 to clarify that the SRs are not required to be met when the Limiting Condition for Operation (LCO) does not require the Main Turbine Bypass System to be operable; (2) clarifying that LCO 3.2.3, "LINEAR HEAT GENERATION RATE," also has limits for an inoperable Main Turbine Bypass System that are made applicable as specified in the Core Operating Limits Report; and (3) deleting an outdated footnote for LCO 3.2.3.

Date of issuance: August 29, 2018.

23

Effective date: As of the date of issuance and shall be implemented within 90 days from the date of issuance.

Amendment Nos.: Unit 1 - 292, Unit 2 - 237. A publicly-available version is in ADAMS under Accession No. ML18222A296; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments.

Renewed Facility Operating License Nos. DPR-57 and NPF-5: Amendments revised the Renewed Facility Operating Licenses and Technical Specifications.

Date of initial notice in Federal Register: November 21, 2017 (82 FR 55412).

The Commissions related evaluation of the amendments is contained in a Safety Evaluation dated August 29, 2018.

No significant hazards consideration comments received: No.

Southern Nuclear Operating Company, Docket Nos.52-025 and 52-026, Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Burke County, Georgia Date of amendment request: January 31, 2018, as supplemented by letters dated April 25, and June 21, 2018.

Description of amendment: The amendments make changes to the VEGP Units 3 and 4 Combined Operating License (COL) in the form of departure from the approved COL Appendix A, Technical Specifications. The amendments make changes to COL Appendix A, Surveillance Requirement 3.8.7.6 to align the test frequency with the expected life of the AP1000 Class 1E batteries.

Date of issuance: The amendments were issued on July 26, 2018.

Effective date: As of the date of issuance and shall be implemented within 30 days of issuance.

24

Amendment Nos.: 135 (Unit 3) and 134 (Unit 4). A publicly-available version is in ADAMS under Accession No. ML18173A301; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.

Facility Combined Licenses Nos. NPF-91 and NPF-92: Amendment revised the Facility Combined License.

Date of initial notice in Federal Register: April 24, 2018 (83 FR 17858). The supplements dated April 25, 2018 and June 21, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs original proposed no significant hazards consideration determination.

The Commissions related evaluation of the amendment is contained in the Safety Evaluation dated July 26, 2018.

No significant hazards consideration comments received: No.

Southern Nuclear Operating Company, Docket Nos.52-025 and 52-026, Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Burke County, Georgia Date of amendment request: June 15, 2018 and supplemented on June 25, 2018 and July 10, 2018.

Description of amendment: The amendment revises commitments related to the construction fitness-for-duty (FFD) program described in the VEGP Units 3 and 4 Updated Final Safety Analysis Report. Specifically, the change involves the creation of a new type of FFD Authorization that allows construction workers temporary access to the construction site pending completion of all pre-access FFD requirements. The individuals will not be given assignments to work on safety or security-related structures, systems, and components prior to the completion of the FFD requirements.

Date of issuance: August 29, 2018.

25

Effective date: As of the date of issuance and shall be implemented within 30 days of issuance.

Amendment Nos.: 141 (Unit 3) and 140 (Unit 4). A publicly-available version is in ADAMS under Accession No. ML18214A659; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.

Facility Combined Licenses No. NPF-91 and NPF-92: Amendment revised the Facility Combined Licenses.

Date of initial notice in Federal Register: June 27, 2018 (83 FR 30199). The supplements dated June 25, 2018, and July 10, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs original proposed no significant hazards consideration determination as published in the Federal Register.

The Commissions related evaluation of the amendment is contained in the Safety Evaluation dated August 29, 2018.

No significant hazards consideration comments received: No.

Tennessee Valley Authority (TVA) Docket Nos. 50-327 and 50-328, Sequoyah Nuclear Plant (SQN), Units 1 and 2, Hamilton County, Tennessee.

TVA Docket Nos. 50-390 and 50-391, Watts Bar Nuclear Plant (WBN), Units 1 and 2, Rhea County, Tennessee Date of amendment request: August 7, 2017.

Brief description of amendments: The amendments revised technical specifications (TSs) limiting conditions for operation and surveillance requirements related to the reactor trip system instrumentation for all four units.

Date of issuance: August 30, 2018.

26

Effective date: As of the date of issuance and shall be implemented in 30 days.

Amendment Nos.: SQN, 343 (Unit 1) and 336 (Unit 2); and WBN, 122 (Unit 1) and 21 (Unit 2). A publicly-available version is in ADAMS under Accession No. ML18197A307; documents related to these amendments are listed in the Safety Evaluation (SE) enclosed with the amendments.

Renewed Facility Operating License Nos. DPR-77, DPR-79 and Facility Operating License Nos, NPF-90 and NPF-96: Amendments revised the Facility Operating Licenses and TSs.

Date of initial notice in Federal Register: November 21, 2017 (82 FR 55416).

The Commissions related evaluation of the amendments is contained in SE dated August 30, 2018.

No significant hazards consideration comments received: No.

Dated at Rockville, Maryland, this 14th day of September 2018.

For the Nuclear Regulatory Commission.

/RA/

Kathryn M. Brock, Acting Director Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.