ML19210A223
| ML19210A223 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/22/1975 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | |
| Shared Package | |
| ML19210A220 | List: |
| References | |
| NUDOCS 7910240936 | |
| Download: ML19210A223 (1) | |
Text
m ,, , ,9
- ^
- H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057 TELEPMONE 717 944-404*
April 22,1975 g_
= . -
fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I Df '
631 Park Avenue M >v h
{
King of Prussia, Pa. 19406 b. mLMliiOh Sperating License DPR-50 Occket 50-289
Subject:
Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly: -
This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.
, and J.G. Herbeitn (THI Station Superintendent) at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> 21 April 1975.
I The following report is submitted in accordance with paragraph 6.7.2.a.1
, (page 6-11) of technical specifications.
On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.
l The redundant pos:p, RR-PIA. was tested to verify operability.
An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.
Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.
Very truly yourt, l
, )klh ?E2
. J erbein
( Station Superintendent JGH/dmn
-G82 hg1024 0i36 .
]