m ,, , ,9

  • ^
  • H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057 TELEPMONE 717 944-404*

April 22,1975 g_

= . -

fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I Df '

631 Park Avenue M >v h

{

King of Prussia, Pa. 19406 b. mLMliiOh Sperating License DPR-50 Occket 50-289

Subject:

Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly: -

This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.

, and J.G. Herbeitn (THI Station Superintendent) at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> 21 April 1975.

I The following report is submitted in accordance with paragraph 6.7.2.a.1

, (page 6-11) of technical specifications.

On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.

l The redundant pos:p, RR-PIA. was tested to verify operability.

An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.

Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.

Very truly yourt, l

, )klh ?E2

. J erbein

( Station Superintendent JGH/dmn