Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20005H2771990-01-0808 January 1990 Forwards Crystal River Nuclear Power Plant Exercise, on 890621-22.No Deficiencies Identified.Four Areas Requiring Corrective Action & Several Areas Recommended for Improvement Noted ML20247L8861989-05-23023 May 1989 Forwards Crystal River Nuclear Power Plant Exercise on 880609. State of Fl & Citrus & Levy Counties Demonstrated Capability to Protect Health & Safety of Public in Event of Radiological Emergency ML20207Q4321987-01-14014 January 1987 Forwards Crystal River Nuclear Power Plant Exercise, of 860619 Partial Participation Joint Exercise.No Deficiencies Noted.Approval Granted on 840215 Will Remain in Effect ML20094S6491984-08-13013 August 1984 Forwards Crystal River Nuclear Power Plant Exercise. Few Specific NUREG-0654/FEMA-REP-1,Rev 1,deficiencies Observed During 840425 Emergency Exercise.State of Fl & Citrus & Levy Counties Participated ML20095L3411984-02-15015 February 1984 Approves State of Fl & Local Plans & Preparedness for Alerting & Protecting Public in Event of Radiological Emergency.Approval Conditional on Verification of Alert & Notification Per App 3 of NUREG-0654/FEMA-REP-1,Rev 1 ML20077R8171983-08-23023 August 1983 Forwards Evaluation of State of Fl,Citrus County,Levy County & Hernando County Offsite Radiological Emergency Preparedness Exercise.Overall Level of Preparedness Adequate 05000302/LER-1982-006, Forwards LER 82-006/03L-01982-02-16016 February 1982 Forwards LER 82-006/03L-0 ML19308E0441977-02-18018 February 1977 Requests NRC Participation & Assistance at Adjudicatory Hearing to Be Scheduled After 770307 Prehearing Conference Re 741231 NPDES permit.770228 Meeting Scheduled in EPA Offices to Discuss Available Biological Data ML19308E0421976-02-13013 February 1976 Responds to NRC 760112 Comments Re Facility NPDES Permit. Draft NPDES Permit Revising Thermal Limits,Chlorination, Percolation Pond Monitoring & Cooling Water Discharges Encl ML19308D9981975-10-0303 October 1975 Notifies That Modified Facility NPDES Permit,Altering Discharge Canal & Deepening Intake Canal,To Be Issued. 751016 Meeting W/Fl Environ Regulation Dept & Federal Agencies in Tallahassee,Fl Scheduled to Discuss Mods ML19308E0601973-12-20020 December 1973 Concurs W/Applicant Proposed Max & Min Stillwater Levels Resulting from PMH Passage & Analysis That Flood Protection Level Sufficient to Withstand Max Limit of Wave Runup Coincident W/Hurricane Induced Water Levels ML19340A3441973-10-0404 October 1973 Forwards Review & Evaluation of Dames & Moore Verification Study of Hurricane Storm Surge Model. ML19329D5871973-10-0101 October 1973 Concurs W/Army Engineer Opinion Re Recommended Water Levels for Design Purposes ML19308D9721973-02-0505 February 1973 Summarizes 730201 Meeting W/Nrc & Doi in Washington DC Re Potentially Serious Environ Problems at facility.730430 Meeting W/Util Planned to Improve & Strengthen Util Study Outline ML19340A3621972-12-0101 December 1972 Responds to Dr Muller 720911 Request for Comments on Des. Facility Electric Power Output Needed to Implement Util & State of Fl Sys Generation Expansion Programs for Meeting Projected Loads & to Provide Reserve Power for Peak Periods ML19308E1611972-11-27027 November 1972 Responds to Dr Muller 720911 Request for Comments Re Des. Recommends That OL Contain Stipulations,Including Plans for Alternate Cooling Sys Significantly Reducing Entrainment & Other Damage to Aquatic Life ML19308E1581972-11-0707 November 1972 Responds to Dr Muller 720911 Request for Comments on Des. Proposed Facility Does Not Appear to Be Hazardous to Public Health & Safety ML19308E1521972-11-0101 November 1972 Forwards Comments on Des.Radwaste Mgt Equipment Should Result in Offsite Doses Consistent W/As Low as Practicable Concept.Fes Should Discuss Secondary Sys Gaseous & Liquid Discharges W/Respect to Environ ML19308E1531972-10-30030 October 1972 Submits Comments on Des & Suppls 2 & 3 to Vol 5 of Environ Rept.Radiological Monitoring Program Seems Adequate.More Details on Specie Selection for Radiological Analysis Desireable ML19308E1541972-10-30030 October 1972 Forwards Comments on Des by Soil Conservation Svc.Forest Svc to Communicate Comments Directly to AEC Upon Des Review Completion ML19308E1551972-10-26026 October 1972 Responds to Dr Muller 720911 Request for Comments on Des.Des Adequate & Complies W/Nepa.Ref to Site as Having Only Marginal Recreational Value Not Advisable ML19308E1561972-10-24024 October 1972 Responds to Dr Muller 720911 Ltr Re Crystal River Des, Environ Rept & Other Pertinent Documents.Submits Comments by Federal Railroad Administration & Faa.Problem Areas Re Fogging Hazards & Air Space Clearances Mentioned ML19340A3601972-10-18018 October 1972 Responds to Dr Muller 720911 Request for Comments on Des. Des Appears to Be Procedurally Adequate.Des Should Contain Comments by State Historic Preservation Officer Re Facility Effects on Historical,Cultural & Archaeological Resources ML19340A3641972-05-25025 May 1972 Discusses Doi Evaluation of Vols 1,2 & 3 of Environ Rept. Ref to Facility Impact on Coastal Environ & Supporting Data for Studies Omitted from Rept.Discharge of Heated Water Into Lagoon Should Be Discussed in Detail ML19340A3991972-02-17017 February 1972 Protests Proposed Facility as Threat to Coastal Estuarine Habitat.Requests Special Attention to Potential Impact & Immediate Planning for Corrective Measures ML19308E0501972-02-11011 February 1972 Responds to AEC Request for Antitrust Advice.Recommends Proposed Util Commitments Be Imposed as License Conditions. Util 711206 Ltr to DOJ Outlining Commitments Encl ML19309A0081972-02-0303 February 1972 Forwards Rept on Crystal River 3 & Possible Effects of Delays Due to Suspension of Const During NEPA Review, in Response to Rs Boyd 711103 Request for Comments Re Util Statement on CP Suspension ML19308E0121971-12-0707 December 1971 Advises That Study of Applicant Proposed Activities Raised Certain Questions Re Antitrust Matters.More & Detailed Info to Be Submitted Later ML19319D3091971-11-22022 November 1971 Ack Receipt of Crystal River 3 FSAR on 711119 & Waterford 3 Amend 6 to CP Application on 711122 ML19319D6061971-10-0404 October 1971 Submits Comments & Recommendations in Response to Rc Deyoung 710306 Request for Review of Fsar.Util Should Continue Cooperation W/Federal & State Agencies in Carrying Out Environ Surveys Prior to Reactor Operation ML19319D3201971-10-0404 October 1971 Submits Comments of Mid-Atlantic Coastal Fisheries Research Ctr,Nmfs & Dept of Commence Re FSAR & Quarterly Environ Status Repts for Jul-Sept & Oct-Dec 1970,& Jan-Mar 1971. Environ Radiological Programs Adequate ML19319D3141968-07-0909 July 1968 Notifies That J Baptist Will to Be Available for Hearing Scheduled at Crystal River Elementary School in Crystal River,Fl on 680716 in Response to 680705 Request ML19317G4451968-04-18018 April 1968 Responds to Rs Boyd 680327 Request for Comments Re Util Change in Plans to Build One,Instead of Two,Facilities at Site Per Psar.Comments Contained in 680212 Ltr Applicable to Current Situation.No Addl Comments Deemed Necessary ML19319D3621968-04-18018 April 1968 Notifies That Radiological Monitoring Program Per Amend 2 to PSAR Adequate.Recommends That Samples Be Collected & Analyzed Every Six Months Per Doi 680212 Ltr.Also Recommends Addition of Program Re Circulation Patterns of Effluents ML19319D5631968-04-18018 April 1968 Responds to AEC 680209 Ltr Forwarding Amend 2 to PSAR Limiting Const to One Facility.Radiological Monitoring Program Adequate in Scope.Frequency of Sampling Omitted. Sampling Should Be Performed Every Six Months ML19319D3261968-04-0202 April 1968 Forwards Review of Geologic & Hydrologic Aspects of Proposed Facility in Response to Rs Boyd Request ML19319D3361968-03-15015 March 1968 Forwards Rept on Site Seismicity for Crystal River in Response to Request ML19317G4851968-02-28028 February 1968 Discusses CP Application Re Storm Surge,Design Wave Height & Wave Period,Wave Runup & Water Level Setdown Per Pmh. Recommends That Util Be Required to re-evaluate Specified Areas Per Us Weather Bureau Study Re PMH Parameters ML19319D3531968-02-12012 February 1968 Submits Comments on CP Application in Response to Rs Boyd 670817 Ltr.Recommends Performance of Preoperational & post-operational Radiological Surveys,Including Studies of Radionuclide Effects on Selected Organisms ML19329D5161967-11-22022 November 1967 Notifies That Util Used Design Water Levels,Wave Characteristics & Wave Runup Criteria Compatible W/Pmh Occurrence Per Review of Related Repts ML19329D5881967-10-26026 October 1967 Forwards Comments on Crystal River 3 & 4, & Comments on Southwest Experimental Fast Oxide Reactor & Oyster Creek 1 Facility Description & Sar.Crystal River Comments Only Encl ML19329D5181967-10-16016 October 1967 Suggests That Applicant Provide Analysis for Probable Max Setdown & Discuss Affect on Facility Operation.Evaluation of Low Water Level & Wave Runup Aspects to Be Made Pending Receipt of Data 1990-01-08
[Table view] |
Text
________ - _
S AEC L'7IBUTION FOR PART 50 DOCXET MF lIAL (TEMPORARY FORM) CONTROL NO: 6976
A
- FILz ENVIRO rROM: DATE OF DOC:
DATE REC'D LTR MEMO RPI OrrdER Fcderal Power Corrission Washington, D. C. 20426 ,
. a. Whillins 12-1-72 12-1-72 X 20 ORIG CC CCER SEh? AEC FL3 X v r. vu ller 1 SiE ned 1 SENI LOCAL PDR X j
d.SS: Q/ PROP IA70 Ih707 NO CYS REC'D f DOCXET 50: I 2 ,
50-302 DESCRIP2 ION:
INCLOSURES: -
Ltr re our 9-ll-72. . . . . furnishing ec=::lents on Draft Enviro Statement for the Crystal . ;
River Nuclear Unit No. 3..... l M01_ Hem 0Ve ACKiiDMED0iD FIANT NAMES: Crystal River Unit 3 l
FOR ACTION /INFORMATION 12-1 72 AB BUTLER (L) SCHW"!NCER(L)
W/ Copias SCEMEL(L) KNIGETON(E)
W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ(L)
W/ Ccpics ZID%NN(L) YOUNGBICOD(E)
W/ Copies W/ Copics W/ Copies COLLER(L) VASSALIO(L)' CEIT;-;0OD(M1)
W/ Copies y SEGAN(E)
W/ Copies W/ Copics W/4Popies KNIEL(L) E. DE! EON . DICi2R(E)
W/ Copies W/ Copics W/ Copies
. W/ Copies IIEEPJ!AL DISTRIBUTION REG FILE j TECH mVIEW VOLIEER
- AEC FDR EaDRIB y HARLESS WADE E DEIRON 000, ROOM P-506A SCHROEDER SHAFER F&M GRIMES F&M BROWN E
- MUETZING/ STAFF MACCARY GAh2 ELL SMILEY CASE LANGE(2) KASTHER HUSSBAUMER f . WILLIAMS E GIAMBUSSO PAWLICKI " f E. GOULBOURNE L M
BOYD-L(BWR) SHA0 A/TIUD SPAEGLER LIC ASST. BRAITPAN y DEYOUNG-L(PWR) KNUTH SKOVHOLT-L lERVICE L SALTZPAN STELID ENVIRO P. COLLTES MASON L MORE MULLER- y SCHWENCER WIISON L PLANS HOUSTON DICKER MAIGRET L REG OPR MCDONALD TEDESCO KNIGETOI! SMITH L DU3E f FILS & REGION (2) IONG YCUUGELCOD GEARIN L FORRIS LAINAS PROJ L'J; E .
STELLE DIGGS L INFO W BENAROYA REGE Tr.1TS 153 L
L C. MILES NN l
EXTERNAL DTSTRI?iTI' TON en c _
h 1-IDCAL PDR c m tal 91ver, Fla
{ 1-DTIE(A m mATHY w (1)65dddit)-NATIONAL LAB'S
" " " '> 2 5 0 Q 1-NSIC(BUCHANAN))
. 1ASLB-YORE /SAYRE 4,,
1-R. CARROLL-OC, GT-E22"T J.-R. CATLIN, E-256-GT PNWL l-PDR-SAN /LA/NY l-GERALD TmOUCHE [
100DWARD[H. ST. ' BROOKHAVEN NAT. LAB 16-CYS ACRS HOLDING 1-CONSULANT'S l-AGMED(WALTER KOESTER, NEWMARK/BLUME/AGABIAN Pm C 427, GT) 1-RDaar&ME%.~R-Y&N -
, A yg. . .
FEDERAL POWER COMMISSION
. WASHINGTON, D.C. 20426 December 1, 1972 m aza v arrua m I~ 4 (s x r
y1 -
50-302 Mr. Daniel R. Muller 6ssistant Director for 6 ,g Q 8 J. f._J Environmental Projects. -
Directorate .of Licensing 8-~
DEC 1. 1972, y -
-U. S. Atomic Energy Commission 81 {,y Q s 1 i . Washington, D. C. 20545- s.:.ai J b um suma
Dear Mr. Muller:
'o) P W
f This is'in reference to your letter dated September 11, 1972,
. requesting comments on the AEC Draft Environmental Statement related to the proposed continuation of the Provisional Construction Permit CPPR-51 and the issuance of an operating license to the Florida Power Corporation for the Crystal River Nuclear Unit No. 3, Docket No. 50-302.
Pursuant to' the National Environmental Policy Act of 1969, and the April 23, 1971, Guidelines of the Council on Environmental Quality, these comments review the naed for the facilities as concerns the adequacy and reliability of the affected bulk power systems and matters related thereto.
In preparing these comments, the Federal Power Commission's' Bureau of Pow [ staff has ' considered the AEC Draft Detailed Statement; the Applicant's ;
Envird. mental Report and Supplement thereto; related reports made'in '
' response to the.' Commission's Statement .of Policy on Reliability and Adequacy of Electric Service (Order No. 383-2); and' the staff's analysis of these documents together with related information from other FPC reports. The staff bases its evaluation of the need for a specific bulk power facility upon long term considerations as well'as the load supply-situation for the- l critical load period .ininediat' e ly following the availability. of the facility..
. Need for' the Facility The Florida Power Corporation's Crystal River Generating Unit No. 3 is an 825 megawatt pressurized-water reactor type. The Crystal River site.
' already contains the. 387-megawatt fossil-fueled steam generating Unit No.1 and the.510-megawatt fossil-fueled steam generating Unit No. 2.
i
- o s
7 I ..
s
-6576 g-
m a
i-Mr. Daniel R. Muller Crystal. River Unit Nc.'3,; originally scheduled for commercial operation in! April-1972, was delavad and 'is- presently scheduled for- commercial service lin-October 1974. It is expected to be.cvailable in time to-assist in meeting the.1974-75Lwinter and;.9',5 summer peak loads. The Florida Power Corporation has been forced ~ toitake temporary measures for supplying the expected demand during the sunner of 1973 due to the thirty-month delay in- the 825 megawatt
. . Crystal River unit .These measures included:the purchase of 200 megawatts of Lgas turbine capacity ~ and the purchase from neighboring t tilities of ' n a -
additional 350 megawatts of capacity.
The Applicant'is one of-seven interconnected systems 1Ioperating throughout. the State of: Florida belonging 'to the Florida Su1 region of the -
Southeastern Electric Reliability Council (SERC). In this laterconnected system network, a; capacity problem that affects one utility will affcet the entire-Subregion's electric power supply. The Florida utilities state that they operate on the concept of helping their neighbor whenever possible, however each utility is responsible for protecting its own system before that of its neighbor.
The current generation expansion program of large generating units
'for the Florida Subregion for ' completion during the years 1972 through
, 1975 is tabulated below:
1 I
1/ The_other systems are: Florida Power and Light Company, Tampa l
-Electric Company,nJacksonville-Electric Authority,~0rlando Utilities Commission, City of Tallahassee and the City of Lakeland. -
i l
i e
s 4
, . m - a
4 3
%. - m
- Mr. . Daniel JR. Muller GENERATION EXPANSION PROGRAM - FLORIDA SUB-REGION Estimated Commercial' Capability In-Service Date- Station Type 77 (MR)
December 1972 2/ Turkey Pt. No. 3 N- 725 March 1973. Turkey Pt. No. 4 -N 725 January 1973 - Sanford No. 5 F -398 February 1973 Big Bend No. 2 F 400 June-1973 Indian River No. 3 F 325 Octcber.1974 Crystal River No. 3 N 825 May 1974 Anclote No. 1 F 515 May;1975 Hutchinsen Island N 850 No. 1 May 1975 Port Manatee F 825 March 1975. Big Bend No. 3 F 400
-June 1975 Northside No. 3 F 550 April 1975 Anclote No. 2 F 515 1/ F-Fossil, N-Nuclear.
2/ Currently in operation and~is. expected to attain 520 MW in November 1972.
The Applicant's and the Florida Subregion's systems normally experience succeedingly greater summer and winter peaks such that there is only negligible seasonal diversity.- Since exposure to the su=mer peaks is generally of greater- duration than that of the winter peaks, the summer peak load periods are considered the more hazardous peak periods. The following tabulation shows the_ electric ' system loads to be -served by the Applicant and by the systems of the Florida Subregion of SERC, including the Applicant, and the relationship of the electric output of the Crystal River Unit No. 3 to the available reserve capacities on the~ Applicant's and Florida Sab-region's systems at the time of the 1974-75 winter and the succeeding ~ 1975 summer peak : load. period. These are the anticipated initial service periods of the new unit, but the life ofithe unit is expected to be some 30 years or more, and it is expected to constitute a significant part of the Applicant's total 1 generating : cap 9 city throughout that period. Therefore, the unit -will
~
be depended upon to supply power to meet future demands over a period' of many' years beyond_the initial service needs' discussed.in.this report.
s
.w. . s
. a. ,
-.4,-
-Mr. Daniel' R. Muller FLORIDA POWER CORPORATION PEAK LOAD - SUPPLY SITUATION 1974-75 1975 Winter Peak Summer Peak Conditions With Crystal River Unit.No. 3
.(825 Megawatts)
Net Total Capability - Megawatts 4,032 4,492 1/
Net Peak Load Megawatts 3,090 3,130 Reserve Margin -~ Megawatts 942 1,362 Reserve Margin - Percent of Peak Load 30.5 43.5 Conditions Without Crystal River Unit No. 3 Net Total Capability - Megawatts 3,207 3,667 1/
Net Peak Load - Megawatts 3,090 3,130 Reserve Margic - Megawatts 117 537 Reserve Margin - Percent of Peak Load 3.8 17.2 Reserve Margin Needs - Based on 25 Percent Criterion - Megawatts 773 783 Reserve Margin Deficiency - Based on 25 Percent
. Criterion - Megawatts 656 246 i
1/ Includes Anclote No. 2, 515 Megawatts. Reduced by 55 megawatts retired capacity. !
j 4
- w
j--
s Mr. Daniel R. MullerL The Southeastern. Electric Reliability Council (SERC) in which the D Applicant and the Florida Systems are members, reports reserve margins of-30.0 and 25.9 percent of peak load for the 1974-75' winter and 1975 summer periods respectively; however, a large portion of these' reserves are vested
~in large'new generating units not yet in operation. The Council's main function"is :the farthering of bulk power system reliability in the SERC area through coordination of the member's expansion plane. Although regional reserves. cay often be helpful in the event of contingencies normally experienced on interconnected power systems, these reserve _ are not a reliable substitute for firm power, base-load capacity within the member's system. In this particular case, the limited interconnection capacity between- Florida and adjoining areas would prohibit large power.
transfers even if surplus. capacity were available. In order to provide adequate reserves for the' region, a proportionate reserve should be maintained by each system, based on its own load.
Transmission Facilities The transmission line additions necessary as a result of the con-struction of Crystal . River Unit No. 3, are- two 500-kilovolt lines 53 and j- 72 miles long emanating from the Crystal River Plant switchyard and-
}- terminating at the Centr il Florida Substation and the' Lake Tarpon Sub-station respectively. ' The 500-kilovolt lines will utilize the vacant sect.# af the right-of-way adjacent to the existing 230-kilovolt double circuic lines constructed for Crystal River Units Nos. 1 and 2.
The Applicant states the existing right-of-way and tower structures were carefully selected to minimize their resulting impact on the environ-ment.
Alternates to the Proposed Facilities and Costs
. The Applicant, in determining the need for additional generation to meet its projected demands, considered a number of alternatives including location, type (base-load and peaking), fuel -(nuclear, coal, oil or gas),_
. the purchase of power, environmental effects and economics. The final decision rested between a base-load nuclear-fueled plant and a base-load fossil-fired plant. Economics and environmental considerations led to Ethe _ selection of the nuclear-fueled plant over the fossil-fired plant, i
L s
[,
s Mr. Daniel R. Muller
~
The availability of Crystal River Unit No. 3 for winter 1974-75 would provide the. Applicant with an expected system reserve margf n of 942
~
megawatts or 30.5 percent of peak load. However, any delay which results in the unavailability of Crystal River Unit No. 3 for the 1974-75 winter peak load period would_ reduce system reserves to_117 megawatts or 3.8 percent' of peak load. . The Applicant's 1975 summer peak load situation improves with the availability of the 515 megawatt fossil-fired Anclote U'it n No. 2' scheduled for commercial operation in April 1975. With the availability of Crystal _ River Unit No. 3 for. the ' summer of 1975, the Applicant would have an expected system reserve margin of 1,362 megawatts or 43.5 percent of peak load. Without the Crystal River unit, system reserves would be reduced to 537 megawatts or 17.2 percent of peak load, and forecasts based on this condition indicate a reserve margin deficiency of 656 and 246 megawatts for the 1974-75 winter and 1975 summer peak periods
-respectively _ in relation to a minimum reserve margin criterion of 25 percent of peak load. Any delay or outage resulting in the unavailability of either of the' scheduled Anclote Units would increase the severity of the effect on system reserves.
With respect to the total Florida Subregion, the availability of Crystal: River _ Unit No. 3 for the 1974-75 winter and 1975 summer peak load periods would provide a reserve margin of 22.1 and 32.'1 percent of peak load, respectively. Should delays make the unit unavailable for the 1974-75 winter and 1975 summer peak load periods, the Florida systems
. forecast a reserve margin of 16.3 and 26.7 percent of peak load, respectively, a reserve deficiency of 1,247 megawatts for the 1974-75 winter peak period based .on a minimmn reserve margin criterion of 25 percent of peak load.
The adequacy _ and reliability of the Florida systems in 1974 and 1975 are not only dependent 'upon the timely commercial operation of Crystal River.Unic No. 3 but also on the timely operation of all the units in the
. Florida Systems' current construction program. Current information indicates that delays are being experienced in bringing many large units into commercial operation and this trend may continue for some time.
The reserve margins indicated in the foregoing tabulations and text are gross in that they' include all of the capacity available not only for meeting expected loads but that which may be out of service due to scheduled
~
{ maintenance -or forced outages and any that might be needed. to meet unforeseen demands due .to errors in load . forecasting and exceptional weather.
~
1_
t
v
-5.
- Mr.: Daniel R. Muller >
FLORIDA ' SUBREGION OF SERC PEAK' LOAD - SUPPLY SITUATION 1974-75 1975-
-Winter Peak . Summer Peak Conditions With Crystal River Unit No. 3-(825 Megawatts)
Net Total Capability - Megawatts
- 17,477 20,258 Net Peak Load _- Megawatts 14,319 '15,337
' Reserve Margin - Megawatts 3,158 4,921 Reserve Margin - Percent of Peak Load 22.1 32.1 Reserve Margin Needs -~ Based on 25 Percent Criterion - Megawatts 3,580 3,834 Reserve Margin Deficiency - Based on 25 Percent Criterion - Megawatts 422 --
Conditions Without Crystal River Unit No. 3 Net Total Capability.- Megawatts 16,652 19,433 Net Peak Load - Megawatts 14,319 15,337 Reserve Margin - Megawatts 2,333 4,096 Reserve Margin - Percent of Peak Load 16.3 26.7 Reserve Margin Needs - Based on 25 Percent Criterion - Megawatts 3,580 3,834, Reserve Margin Deficiency - Based on 25 Percent criterion. Megawatts 1,247 --
~The' staff of the Bureau of Power is of the opinion that peninsular Florida, due to its . lack of adequate transmission capability with adjoining states, its generating unit types and sizes and minimal seasonal diversity,
- needs reserves of about 25 percent' of peak load. Except for the Florida' Subregion's 26.7 percent reserve for the. summer of'1975, this minimum reserve margin. criterion of 25 percent of peak load is not- present on the Applicant's or the Florida Subregion's systems without Crystal River Unit No. 3 being available~, even with all other existing and sch'eduled generating l
. capacity'available as. scheduled.
f f
Mr. Daniel R. Muller The Applicant discussed only in general terms alternative sources of power generation and their associated costs and benefits. The Bureau of Power staff's studies have shown that no practical sources of purchased power are available in the magnitude necessary to replace Crystal River Unit No. 3.
Conclusions The staff of the Bureau of Power concludes that the electric. power output represented by the Crystal River Unit No. 3 is needed to implement the Applicant's and the Florida systems' generation expansion programs for meeting projected loads and to provide some reason measure of reserve margin capacity for the 1974-75 winter and 1975 su r peak periods.
Very truly yours, 1
. i s Chief, Bureau of Power t