ML19347C959
| ML19347C959 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/03/1981 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM 3-011-03, 3-11-3, NUDOCS 8103100387 | |
| Download: ML19347C959 (2) | |
Text
i 1
. l Rorida Power Co n PO a a r so ns March 3, 1981 File: 3-0-30
- 3-011-03 Mr. Robert W. Reid Branch Chief Operating Reactors Branch #4 Division of Operating Reactors U. S. Nuclear Regulatory Comission Washington, D. C. 20555 et[1]_1QQf NY k fv'Q
Subject:
Crystal River Unit 3 Docket No. 50-302 % p '0 e g$h dC-Operating License No. DPR-72 2.A NUREG-0737 Item II E.1.2 / v .((2 Emergency Feedwater System Upgrade ,
e
Dear Mr. Reid:
I E By letter dated December 19, 1980, Florida Power Corporation submitted a preliminary description of the proposed upgrade to the Emergency Feed-water System at Crystal River Unit 3. Your letter dated January 28, 1981, stated that our proposed upgrade was conceptually acceptable and we should proceed with our design. Also, your letter requested our schedules for submittal of other information required for your review and final approval. Florida Power Corporation hereby states the requested submittal schedules to be as follows:
June 15, 1981 A revised reliability analysis will be submitted which addresses the concerns as stated in your January 28, 1981, letter.
August 3, 1981 A final system description will be submit-ted for your approval. ,
90 days prior A proposed change to the Standard Techni- gf to final im- cal Specifications will be submitted for OTb plementation your approval.
Spring 1983 Final implementation of the upgrade will Refueling Out- be completed.
age
[g 8103100387 General Office 32o1 wty tourtn street soutn . P O Box 14042. st Petersourg Fionca 33733 813-866-5151
4 W
Mr. Robert W. Reid Page Two March 3, 1981 The implementation schedule as delineated above allows ample time for your review and approval and the necessary delivery time for hardware.
Also, worthy of note in your assessment of our schedules is the fact that a lengthy outage will be reqaired to perform an upgrade of this magnitude.
Very truly yours, FLORIDA POWER CORPORATION c.f hjrato(
Dr. P. Y. Baynard Manager Nuclear Support Services Mardis(T01)D1-1 E
F-(
e- =y-,e- --<-.g e . -nv--y--- <**y e- s .- -,
, , y , <r--, ,+, , .- e-- -y