ML20004B255

From kanterella
Revision as of 20:53, 29 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That Listed GE Documents Be Included in Docket Files for Facilities
ML20004B255
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/20/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-81-900, NUDOCS 8105270454
Download: ML20004B255 (2)


Text

.

>A3]

) l' lJ 2r u n m m r ,2. m :: m on, May 20, 1981 File: FG-351A(B) Serial No.: NO-81-900 office of Nuclear Reactor Regulation g[

ATTENTION: Mr. T. A. Ippolito, Chief y'

e Operating Reactors Branch No. 2 f United States Nuclear Regulatory Cotamisalon ~/ f .h Washington, D. C. 20555 f. j l,l4 y 2 6 I9S k gl BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 p Q(

DOCKET NOS. 50-325 AND 50-324 .

A LICENSE NOS DPR-71 AND DPR-62 MARK I PROGRAM p '\U '

Dear Mr. Ippolito:

There are several documents that NRC has received from General Electric Company (GE) regarding the Mark I Program. In order to ensure completeness of the NRC docket files for the Brunswick Steam Electric Plant Unit Nos. 1 and 2, Carolina Power & Light Compary (CP&L) requests that the following documents be included on the Brunswick docket files:

1. NEDM-24527, "Long Term Application of Drywell/Wetwell Differential Pressure Control"; transmitred to NRC by L. J. Sobon's June 6, 1978 letter.
2. NEDE-23898-P, "Aralytical Model for Computir.g Water Rise in a Safety / Relief Valse Discharge Line Following Valve Closure"; transmitted to NRC by L. J. Sobon's October 31, 1978 letter.
3. NEDO-21888, " Mark I Containment Program - Load Defini-tion Report"; transmitted to NRC by L. J. Sobon's December 28, 1978 letter.
4. NEDE-21878-P, " Analytical Model for Computing Air Bubble and Boundary Pressures Resulting from an S/RV Discharge Through a T-Quencher Device"; transmitted to NRC by L. J. Sobon's February 26, 1979 letter.

. O f

(, \ ,

8195 r 7 0 4 5 4

5. NEDE-23749-1-P, " Comparison of Analytical Model for Computing Safety / Relief *!alve Discharge Line Transient Pressures and Forces to Monticello T-Quencter Test Data; transmitted to NRC by L. J. Sobon's March 20, 1979 letter.
6. NEDO-24583, Revision 1, " Plant Unique Analysis Application Guide"; transmitted to NRC by L. J. Sobon's December 27, 1979 letter.

The sole purpose of this letter is to update the Brunswick docket files and not to address specific applicability of these docu-ments to the Brunswick units. Should you have any questions concerning this request, please contact my staff.

Yours very truly, c

8 $y//

E.'E. Utley ExecutiveVicePreside[nt '

Power Supply and i Engineering & Construction JAM /je (135-897) ,

[

I i

l l

i i

l l

- - _ . . . , _ _ . . . _ _ , _ _ _ _ . _ . _ . . . -, , _ . . _ _ _ . . . _ _ . _ _ . _ _ _ _ _ _ , - . , . . . _ , _ , . _ . . _ . . _ _ _ _ _ . _ _ .