ML20004E410
| ML20004E410 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/04/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20004E411 | List: |
| References | |
| 12600, NUDOCS 8106120151 | |
| Download: ML20004E410 (2) | |
Text
,
7.
y
- t m a m
- s. .w
.p dsG
\ I9 M@
'I i 1 IhOY[3U James w cook y , l *. .% . u &.,.,,
.:d j Vice President - Projects, Engsneenng and Constructson
% 'gy General offices: 1945 West Pernali Road, Jackson, M8 49731 * (517) 788-o453 June 4, 1981 $3LE'/,
[ ' $
Harold R Denton, Director Office of Nuclear Reactor Regulation b e'j/.
U(
f (y '~
US Nuclear Regulatory Commission -
Washington, DC 20555 c3 g MIDLAND PROJECT DOCKET NO 50-329, 50-330
' ( g'.j r.
- COLD SHUTDOWN DESIGN REVIEW BOARD FILE: 0929.2 UFI: 02352(S) SERIAL: 12600 ENCLOSURES: (1) PRESENTATION TO THE UTILITY DESIGN AND REVIEW BOARD TO ACHIEVE AND MAINTAIN COLD SHUTDOWN, MEETING TRANSCRIPT, VOLUMES 1 AND 2, AND (2) RESPONSE OF BECHTEL POWER CORPORATION TO OUTSTANDING ACTION ITEMS FROM THE COLD SHUTDOWN CESIGN REVIEW BOARD Six copies of t.he transcript and the response of Bechtel Power Corporation to the outstanding action items of the Midland Cold Shutdown IJesign Review Board are enclosed. The transcript has been reviewed and edite-ially corrected as necessary. The disposition of each action item has been eviewed by the Cold Shutdown Design Review Board and the Board's comments have been incorporated.
Further analyses called for in the disposition of the action items will be completed in accordance with project procedures. The Board has thus determined that all outstanding concerns have been adequately addressed.
Consumers Power Company will continue to follow the remaining detailed design and analyses associated with the cold shutdown capability of the plant and will conduct the associated checkout, preoperational testing and startup testing. Any scope changes resulting from this further effort will be evaluated and implemented as necessary in the context of our scope change control program.
If your staff has any questions which were not dealt with satisfactorily by the Review Board, we believe such questions should be raised promptly so that this subject can be closed out completely. Consistent with our understanding of such reviews, we hope that our efforts lead to early SER sections on the subject material.
JWC/JRW/re ,
[
8.106120$'
oc0581-0373a102 l
1