ML20004F096

From kanterella
Revision as of 14:40, 29 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 81-014/03L-0 & 81-015/03L-0
ML20004F096
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/09/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20004F097 List:
References
NUDOCS 8106160499
Download: ML20004F096 (1)


Text

~~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - ' ~ ~ ~ ~

'"'t.tuing Addrfss Alibama Pow r Company 600 Nortn 18th Street 4 - Post Othca Box 2541 Birmingham, Alabama 35291 Te!ephone 205 783-6031 -

F. L Clayton, Jr.

Senior %ce President Flintridge Building Alabama Power the scansm e senc r, rem June 9, 1981 . , ,

@ A C I ' ' I,D Docket No. 50-364  %

b,

& l

,/

/

U. S. Nuclear Regulatory Cec:nission

~

T u.

,, 'Y f )^/ s\g Office of Inspection and Enforcement l e,5 pgI 7 A -l Region II g4'c4*o'r ,9 101 Marietta S?ceet, N.W.

Suite 3100 (k\, h g

Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Reports Nos.

LER 81-014/03L-0 and LER 81-015/03L-0 are forwarded with three (3) copies of each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrences.

- If you have any questions, please advise.

  • 'Yours very t #7, t

/ .

s %'y '

FLCJr/JRC:nac

'/6Y'''"~

y Enclosure xc: M (30 copies)

Director, MIPC (3 copies) l l

.Y}

b\\

J i

8106260777 5

.- . .-