Responds to NRC 890616 Ltr Re Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12.Corrective Actions:Preventive Maint Procedures for Bulletin 85-003 Will Be Revised by 900115
ML20005F166
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/05/1990
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-85-003, IEB-85-3, NUDOCS 9001160005
Download: ML20005F166 (2)


Text

w ,

y _

(?f ,

_F~ ,

o. i BALTIMORE i GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARY 1.AND 21203 oc noc c. cace' JanuarE 5,1990 1
i. Vict PatsiDth?-  ;

Nucatan cutmot I (400#SO*edSS R U. S. Nuclear Regulatory Commission ,

Washington, DC 20555 i

ATTENTION: Document Control Desk  ;

1 I

SUBJECT:

Calvert Cliffs Nuclear Power Plant >

[. Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 l Reply to Notices of Violation (Inspection Report Nos. 50-317/89-12; ,

50-318/89-12) i

REFERENCES:

(n) Letter from Mr. J. P. Durr (NRC) to Mr. G. C. Creel (BG&E),

dated June 16, 1989, same subject I (b) Letter from Mr. G. C. Creel (BG&E) to Document Control Desk l (NRC), dated July 27, 1989, same subject j l

(c) Teleconference between Mr. G. L. Bell (BGAE) and Mr. J. E. Beall (NRC) on January 2,1990, Corrective Action Extension Gentlemen:

In response to a Notice of Violation issued June 16,1989 (Reference a), BG&E agreed to take several corrective actions with respect to our Motor Operated Valve (MOV) '

rnaintenance program. As part of the corrective actions, we agreed to revise our preventive maintenance procedures for Bulletin 85-03 MOVs by December 31, 1989 (Reference b). We did not meet this schedule because the MOV Project Manager did not effectively resolve impediments to the procedure revisions,

! - Both Units have remained shutdown since the MOV inspection and have not entered into

! a mode where the identified MOVs are required to be OPERABLE. Also, preventive ,

maintenance (PM) for these valves is not scheduled until the end of January. We will complete the maintenance procedure revisions by January 15, 1990. In addition, we will i

not perform any Bulletin MOV PM until the procedures are revised, i

l We informed Mr. J. E. Beall, our acting Senior Resident inspector, January 2, 1990, I that we would not meet our schedule for this corrective action (Reference c).

Q 5 900105 PD$Ajf00K05000317 $0I r PDC I t

a:

Document Control Desk January 5,1990 Page 2 Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, i

/- -