ML20009C032
| ML20009C032 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/10/1981 |
| From: | Manry M GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20009C033 | List: |
| References | |
| PM-81-584, NUDOCS 8107200189 | |
| Download: ML20009C032 (1) | |
Text
i
- A
, Georgia Power Company Post Office Box 442 Ban;sy. Georgia 31513 Tele-5one 912 367-6686 l
912 367-7781 b
Edwin I. Hatch Nuclear Plant COI U OWCT
,, a r 4 l
l July 10, 1981 l
i PM-81-584 PLANT E. I. HATCH NRC Monthly Operating Report Office of Plans and Schedules Directorate of Licensing United States Nuclear Regulatory Commission Washington, D. C. 20545
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Decket #50-366.
T Manty M.
b[ SA ._
Plant Manager CLC/pebc
(
0 h00
'7 \\ \
8107200189 810710 i PDRADOCK05000g R
_ _ _ _ _ _ _ _ _ _