ML20009D869
| ML20009D869 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/18/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-02, IEB-79-2, NUDOCS 8107240445 | |
| Download: ML20009D869 (1) | |
Text
'
la a a o r Company OFFICIAL COPY f
600 Nortn 18th Street Po:t Cf*ic] Box 2641 ig j
Birmingham. Alabama 33291 --
Telephone 205 783-6081 F. L Claytro, Jr. b Z7sC$4'"' y .qc Alabama Power the Southern electrc system June 18, 1981 Docket No. 50-348 js -
Mi 19e i Mr. J. P. O'Reilly V. S. Nuclear Regulatory Commission 2h '
c
?
3 Region II, Suite 3100 Cgb3 " S e 3 o7 ;!
n !
101 Marietta Street, N.W.
- f. g$go Atlanta, Georgis 30303 {, o.s.'
Dear Mr. O'Reilly:
h ,w ,,
- s. i I.E. BULLETIN 79-02 FARLEY NUCLEAR PLANT UNIT 1 During the second refueling outage, Alabama Power Company completed an anchor bolt upgrade program. There are now fewer than 5% of the concrete expansion anchor bolts with safety factors less tnan the bulletin requirements on any system within the scope of the program. Alabama Power Company believes these actions have brought Farley Unit 1 into full compliance with the bulletin requirements. -
Very truly yours, F. L. Clayton Jr.
FLCJr/RSF:de cc: Mr. R. A. Thbmas Mr. G. F. Trowbridge Mr. E. A. Reeves Mr. W. H. Bradford Office of I & E g//
Division of Reactor Operations Inspection Washington, D. C. 5 lD 45 e1061s kDk)$0K0500034g 0