MONTHYEARML18138A3572018-06-25025 June 2018 Transmittal of Draft Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design (Non-Proprietary) - Letter Project stage: Draft Approval ML18360A2302019-02-0707 February 2019 Request for Withholding Information from Public Disclosure in December 19, 2018, Additional Information Regarding Anp 10342P;Gaia Fuel Assembly Mechanical Design (CAC No. MF9078; EPID L-2016-TOP-0016) Project stage: Withholding Request Acceptance ML19204A0592019-09-24024 September 2019 Transmittal of Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design Project stage: Approval ML19204A0552019-09-24024 September 2019 Resolution of Framatome Comments Made on Draft Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design Project stage: Draft Approval ML19204A0482019-09-24024 September 2019 Final Safety Evaluation for Framatome Inc. Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design Project stage: Request ML19204A0512019-09-24024 September 2019 Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design Project stage: Approval ML19316E0652019-12-0303 December 2019 Request for Withholding Information from Public Disclosure in November 1, 2019, Publication of ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design (CAC No. MF9078/EPID L-2016-TOP-0016) Project stage: Withholding Request Acceptance ML19322C9462019-12-31031 December 2019 Verification Letter of the Approval Version of Framatome Inc. Topical Report Anp 10342P-A, Revision 0, Gaia Fuel Assembly Mechanical Design (CAC: MF9078/EPID: L-2016-TOP-0016) Project stage: Other 2019-12-31
[Table View] |