ML19225D008

From kanterella
Revision as of 00:41, 24 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-047/03L-0
Date released: 08/27/2019 Download: ML19225D008


LER 79-047/03L-0 on 790617:monitor Tripped & Failed to Restart During Normal Surveillance.Caused by Loose Bracket Inside Photohelic Pressure Gauge.Bracket Adjusted,Tightened & Returned to Normal Operation
ML19225D010
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/16/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225D010 (2)
Forwards LER 79-047/03L-0
ML19225D007
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/16/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225D007 (1)