ML19260D677

From kanterella
Revision as of 12:47, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 80-001/03L-0,80-002/03L-0 & Updated LER 79-087/03X-1
Date released: 10/01/2019 Download: ML19260D677


Updated LER 790987/03X-1:on 791114,during Mode 5 Operation, Leak Was Discovered in Socket Weld on LPSI Flow Orifice Valve 2SI-5091B.Failure Resembles Mechanical Fatigue Failure of Weld.Valve Replaced & Socket Weld Dye Penetrant Checked
ML19260D685
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/05/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D685 (1)
LER 80-002/03L-0:on 800110,during Mode 1 Operation,Core Protection Calculator C Failed,Resulting in DNBR & Linear Power Density Trips in Channel C Primary Power Sys.Cause Undetermined.Sys Restarted During Failure Analysis
ML19260D684
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/05/1980
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D684 (1)
LER 80-001/03L-0:on 800107,during Mode 1 Operation, Containment Isolation Valve 25V-5876-2 Failed to Close After Taking Samples from Safety Injection Tanks for Boron Analysis.Caused by Faulty Valve Position Indication
ML19260D680
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/05/1980
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D680 (1)
Forwards LERs 80-001/03L-0,80-002/03L-0 & Updated LER 79-087/03X-1
ML19260D676
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/05/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D676 (1)