ML19290E176

From kanterella
Revision as of 03:56, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 80-007/03L-0,80-009/03L-0, 80-010/03L-0, 80-011/03L-0,80-012,80-013/03L-0 & 80-014/03L-0
Date released: 10/31/2019 Download: ML19290E176


LER 80-014/03L-0:on 800214,while Testing Control Grade Auto Start Feature,A & B Mdaf Pumps Failed to Auto Start on Loss of Main Feedwater Pump Test Signal.Caused by Inadequate Design Change Control.Design Review Strengthened
ML19290E202
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E202 (4)
LER 80-013/03L-0:on 800202,during Safety Injection W/Loss of Sys Pressure Test W/Bubble in Pressurizer,Containment Isolation Valve 1-CCW-HV-3095 Did Not Fully Close.Caused by Handwheel Outside Neutral Position.Handwheel Adjusted
ML19290E201
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E201 (2)
LER 80-012/03L-0:on 800201,during a Train Loss of Offsite Power test,1B Component Cooling Water Pump Failed to Auto Start.Caused by Improper Positioning of 1C CCW Pump Handswitch.Switch Correctly Positioned & Test Completed
ML19290E198
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E198 (3)
LER 80-011/03L-0:on 800202,during Safety Injection W/Loss of Sys Pressure Test W/Bubble in Pressurizer,Containment Isolation Valve 1-SW-MOV-3134 Failed to Close Fully.Caused by Motor Control Ctr Breaker Thermal Overload Trip
ML19290E197
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E197 (1)
LER 80-010/03L-0:on 800201,during Train a Diesel Generator Loss of Sys Pressure Test,Flow Control Valves Failed to Open Automatically on Pump Auto Start.Caused by Misaligned Mechanism Operated Contact Switch.Switch Realigned
ML19290E192
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E192 (2)
LER 80-009/03L-0:on 800201,during Loss of Offsite Power Surveillance Test,Output Breaker for Diesel Generator 1B Failed to Auto Close.Caused by Misaligned Mechanism Operated Contact Switch.Switch Realigned
ML19290E184
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E184 (2)
LER 80-007/03L-0:on 800202,during Train B Diesel Generator Loss of Sys Pressure Test,Svc Water Pump 1D Failed to Auto Start & Would Not Manually Start.Caused by Test Equipment Short Circuiting Sequencer Relay Contacts.Equipment Removed
ML19290E177
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
FOIA-81-159
Download: ML19290E177 (1)
Forwards LERs 80-007/03L-0,80-009/03L-0, 80-010/03L-0, 80-011/03L-0,80-012,80-013/03L-0 & 80-014/03L-0
ML19290E175
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E175 (1)