ML19309E636

From kanterella
Revision as of 05:24, 20 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-021/03L-0 & Updated LER 79-056/03L-1
Date released: 11/19/2019 Download: ML19309E636


Updated LER 79-056/03L-1:on 791108,twenty Fire Barrier Penetrations Were Determined Not Functional.Caused by Improper Interpretation of Procedures.Limiting Conditions for Operation Met
ML19309E652
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/09/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309E652 (2)
LER 80-021/03L-0:on 800316,during Review of Surveillance Test Schedule,Found FNP-1-STP-9.0,RCS Leakage Test Had Not Been Performed within Time Interval.Cause Not Stated. Personnel Instructed Re Test Interval
ML19309E645
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/09/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309E645 (2)
Forwards LER 80-021/03L-0 & Updated LER 79-056/03L-1
ML19309E635
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/09/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309E635 (1)