ML19312D498

From kanterella
Revision as of 00:30, 20 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 80-015/03L-0,80-016/03L-0 & 80-017/03L-0
Date released: 11/22/2019 Download: ML19312D498


LER 80-017/03L-0:on 800222,while Manually Starting Turbine Driven Auxiliary Feedwater Pump,Turbine Tripped on Overspeed.Caused by Limit Switch Being Out of Adjustment. Limit Switch Adjusted & Feedwater Pump Returned to Svc
ML19312D513
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D513 (1)
LER 80-016/03L-0:on 800215,while Performing Surveillance Test Procedure FNP-1-STP-22.17,TDAFWP Thrust Bearing Exceeded 160F.Caused by High Bearing Oil Level After Maint on Thrust Bearing.Oiler Assembly Repositioned
ML19312D509
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D509 (2)
LER 80-015/03L-0:on 800217,after Tying Main Generator Onto Grid,Deh Sys Malfunctioned Causing Load Increase,Resulting in Avg Decreasing to 539 F.Cause Under Investigation.Deh Placed in Manual to Stop Load Increase
ML19312D504
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D504 (1)
Forwards LERs 80-015/03L-0,80-016/03L-0 & 80-017/03L-0
ML19312D497
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D497 (1)