ML19320B075

From kanterella
Revision as of 09:05, 19 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Final Deficiency Rept Re Spent Fuel Pool Gates
Date released: 11/30/2019 Download: ML19320B075


Revised Final Deficiency Rept Re Spent Fuel Pool Gates. Gates Are Not Designed to Seismic Category 1 Requirements Per Reg Guide 1.13.QA Aspects of Gate Integrity Will Be Verified for All Three Plants
ML19320B078
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/02/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19320B078 (2)
Forwards Revised Final Deficiency Rept Re Spent Fuel Pool Gates
ML19320B074
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/02/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: STELLO V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19320B074 (1)