ML19329B920

From kanterella
Revision as of 14:12, 18 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards RO NP-32-77-01
Date released: 12/09/2019 Download: ML19329B920


RO NP-32-77-01:on 770428,incore Instrumentation Installed W/O Direct Supervision of Licensed Senior Reactor Operator. Caused by Procedure Inadequacy.Procedure Modified to Meet Tech Specs
ML19329B928
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/10/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
References
Download: ML19329B928 (2)
Forwards RO NP-32-77-01
ML19329B919
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/10/1977
From: Roe L
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B919 (1)