ML19338F555

From kanterella
Revision as of 20:40, 17 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Draft of Special Low Power Testing Procedures & Safety Evaluation,In Compliance w/NUREG-0694 Fuel Loading Requirement
Date released: 12/18/2019 Download: ML19338F555


Special Low Power Tests Safety Evaluation.
ML19338F565
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From:
DUKE POWER CO.
To:
References
Download: ML19338F565 (47)
Draft Special Low Power Testing Procedure TP/1/A/2150/26, Simulated Loss of All Onsite & Offsite AC Power.
ML19338F564
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From:
DUKE POWER CO.
To:
References
Download: ML19338F564 (10)
Draft Special Low Power Testing procedures,TP/1/A/2150/23, Natural Circulation W/Simulated Loss of Offsite Power.
ML19338F561
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From:
DUKE POWER CO.
To:
References
Download: ML19338F561 (11)
Draft Special Low Power Testing procedures,TP/1/A/2150/21, Effect of Steam Generator Isolation on Natural Circulation.
ML19338F558
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From:
DUKE POWER CO.
To:
References
Download: ML19338F558 (16)
Draft Special Low Power Testing procedure,TP/1/A/2150/20, Natural Circulation Verification.
ML19338F557
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From:
DUKE POWER CO.
To:
References
Download: ML19338F557 (17)
Forwards Draft of Special Low Power Testing Procedures & Safety Evaluation,In Compliance w/NUREG-0694 Fuel Loading Requirement
ML19338F554
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/10/1980
From: Parker W
DUKE POWER CO.
To: DENTON H R, YOUNGBLOOD B J
Office of Nuclear Reactor Regulation
References
Download: ML19338F554 (1)