ML19345B838

From kanterella
Revision as of 03:38, 17 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-085/03L-0
Date released: 12/25/2019 Download: ML19345B838


LER 80-085/03L-0:on 801023,HPCI Sys Turbine Reached 150% of 4,000 Rpm Full Flow Speed,Rendering Sys Inoperable.Caused by Failure of Turbine Governor & Resistor in Speed Control Circuitry.Governor & Resistor Replaced
ML19345B843
Person / Time
Site: Pilgrim
Issue date: 11/20/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345B843 (1)
Forwards LER 80-085/03L-0
ML19345B837
Person / Time
Site: Pilgrim
Issue date: 11/20/1980
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345B837 (1)