Text
. . - . .. -.. . .-
- ....
3 .
.'; .
?' W$LF CREEK NUCLEAR OPERATING CORPORATK)N
' aann A.asney lr . vm pe emn
- l. Nueser Opmenone 1
November 14, 1989 l
,.
NO 89-0200
. :,
' U. S. ~ Nuclear Regulatory Connaission ATTN: Document Control Desk
!! ail Station P1-137 Washington, D. C. 20555 '
i
Subject:
Docket No. Sn.482: October, 1989 Monthly Operating Report .
-l Gentlemen:
.
1 Ahtached is the October, 1989 Monthly Operating Report for Wolf Creek i
, Generating Station. This submittal is being made in accordance with the -
requirements of Technical Specification 6.9.1.8..
'
1
'
Very truly yours, 4 C. 4 :
John A. Bailey L
'
Vice President Nuclear Operations ,
-JAB /aem ,
..
Attachment cc B. L. Bartlett (NRC), w/a
'
E. J. Holler (NRC), w/a R. D. Martin (NRC), v/a D. V. Pickett (NRC), w/a h.1220231 891og3 g, ADOCK oSoco4g7 PDC r'.O. Box 411/ Burimgeon, KS 6816301 F%me: (316) 364-8831 An Equal opporamny Employer W'*C VET
, s, , - . . . - , - . . ~ . ~ _ . - , - . . . . . . . - . . . . . . . . _ . . - - . , . . . - - - . _ . . - . . . . , - . . - . . ,
. _. -
I LAttachment'to'NO 89-0200 t r ,
.,
.
-
4
!:
,. .
NOLF CREEK NUCLEAR OPERATDG OTPORATION NOLF CREEK GENERATDG STATION 10NIHLY OPERATDG RERRT 1
'
,
10tmit October YEAR: 1989 Docket No.: 50-482
.
Facility Operating License No.: NPF-42
.
Report No. 56 _
-(
i-Prepared by:
Merlin G. Williams t
t
.
t d
.. .-
i
'
i' NttachmenttoNO 89-0200
. i 4 . ,
- 1 1
l SLNMARY l
)
I The following report highlights the operating experience of Wolf Creek Generating Station for the nonth of October,1989. This report is being i provided pursuant to Technical Specification 6.9.1.8. 1 I
I. StM4ARY OF OPERATItG EXPERIENCE I On October 01, at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br />, reactor power as reduced to 55% to replace a l power supply on "B" Main Feedwater Punp. At 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br /> reactor power m a i returned to 100%.
.
On October 17, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, reactor power ma reduced to 30% to replace the power / load unbalance transducer in the turt>ine control cabinet. At 2052 ;
hours reactor power es returned to 100%.
On October 30, at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br /> rnactor power as increased 2.2% due to a revised calorimetric sucaiure using measured steam flow versus measured '
feed flow. This as done in response to an apparent feedwater venturi fouling proble.
(
II. MAJOR SAFETIY REEATED MAINTENANCE JCPIVITIES
- 1. Replaced input relay K129 train "A" in the Solid State Protection Syste (SSPS).
- 2. Replaced engine driven jacket eter pump nochanical seal on Diesel Generator "A".
- 3. Replaced 4-way actuator on Feedwater. Isolation Valve AEEV040.
Wolf Creek Generating Station Monthly Operating Report October 1989 Page 1 of 5
~
,
. _ . . ._
i
-
. Attachment to NO 89-0200
. ~ i
- !
9 OPERATDG IRTA REKRT
'
DOCKET NO. 50-482 NOIE CREEK GENERATING STATION NOLF CREEK NUCLEAR OPERATDG CCRPCRATICN IRTE 11-01-89
(%EPIETED BY M. Williams l
'
TELEMENE316-364-8831 OPERATDG STMUS .
- 1. Reporting Periods October, 1989 Gross Hours in Reporting Period 745 1
- 2. Currently Authorized Power Ievel(NWt): 3411 Max. Depend. Capacity (MHam-Net): 1135 Design Electrical Rating (NNe-Net): 1170
,
- 3. Power Invel to Nhich Restricted (If Any)(We-Net): N/A 4.' Reasons for restriction (If Any): N/A
'Ihis Month Yr to Date Cumulative
- 5. Number of Hours Reactor was Critical 745.0 7,251.3 28,835.4
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 l
- 7. Hours Generator an Line 745.0 7.155.6 28,323.1
(
- 8. ' Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thernal Energy Generated (NHR) 2,516,573 24,144,000 93,716,117
- 10. Gross Electrical Energy Generated (MNR) 866,128 8,353,629 32,522,634
- 11. Net Electrical Energy Generated (NHR) 831,317 8,017,985 31.031,091
- 12. Reactor Service Factor 100.0 99.4 79.0
- 13. Reactor Availability Factor 100.0 99.4 80.0
- 14. Unit. Service Factor 100.0 98.1 ,
77.6
. 15. Unit Availability Factor 100.0 98.1 77.6
- 16. Unit Capacity Factor (Using NDC) 98.3 96.8 75.3
- 17. Unit Capacity Factor (Using Design NWe) 95.4 93.9 72.7 l 18. Unit Forced Outage Rate 0.0 0.7 4.8 l
l 19. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of each):
Refueling Outage on March 15, 1990, for 70 days.
- 20. If Shut Down at Erx3 of Report Period, Estinated Date of Startup: N/A
- j. Wolf Creek Generating Station l Monthly Operating Report October 1989 Page 2 of 5 1
1
, -- -
Attachment'to NO 89-0200
-.- -t
.
4, AVERIGE IRILY UNIT POWER IAVEL DOCKET NO. 50-482 WOLF CREEK GDERATIIG STATIN
'
WOLF CREEK NUCLEAR OPERATI!G OCRP@ATIN IRTE 11-01-89 CmPIETED BY M. Williams .
TE[EPENE316-364-8831 IRY AVERAGE DMLY POWIR LEVEL IRY AVERAGE IRIIX 10WER IAYEL '
(PHe-Net) ()Me-Net) 1023 4
1 17 960 2 1121 18 1121 I 3 1122 19 ' 1122 4 1123 20 1122 5 1123 21 -1126 6 1123 22 1126
.
7 1123 23 1125 8 1123 24
,
1125 9 1123 25 1124
.
10 1124 26 1125 11- 1123 27 1124
.
12- 1122 28 1124
'
__,
,
13 1122 29 1124
'1' 4 - 1122 30 1134 15 1122 31 1149 16 1122 +
Wolf Creek Generating Station Monthly Operating Report October 1989 Pago 3 of 5
- - . _---
--
,; - . .
. .
.
.n.- - , ., _ -
%- . . .
- o -
Attachment tO;NO 89-0200 -
<
. .
~'
UNIT SHUTDOWN AND POWER REDUCTIONS '
DOCKET No. 50 4824_
WOLF CREEK CENERATING STATION' VOLF CREEK NUCLEAR OPEFATING CORPORATION DATE 11-01-89 COMPLETED BY M. Williams REPORT MONTH October. 1989 TELEPHONE 316-364-8831 TYPE METHODS SHUTI MG F:-FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /COMENTS No Date S: SCHEDULED fBOURS) (1) OR REDUCING POWERf2) 7 891001 F 0 B 5 Reduced reactor power to SSI to replace a power supply.
on "B" Main Feedwater Pump.
8 891017 F 0 B 5. Reduced reactor power to 30Z to replace power / load unbalance transducer in the turbine control cabinet.
SUMMARY
- Unit operated near 100Z power throughout the month with exception to the above mentioned derates.
(1) REASON: A EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTIhTED
- 5. REDUCED LOAD.
,
- 9. OTHER i
Wolf Creek Generating Station Monthly Operating Report October 1939 Page 4 of 5
. .- _-. _.
m . _ .. . - _ . . . _ . . . .
_
V,. ..
F r
_Attqctlment to NO 89-0200
-
_.. .
,
,_
.
.
WOLF CREEK NUCIEAR OPERATING CORPORATION HOIE CREEK GENERATING STPLTICN UNIT 10. 1 KNIH Octr h r, 1989 SGMARY OF OPJRATI!G l'MPERIENCE I.icted below in chronological sequence is a sunnary of operating experiences far this nonth which required load reduction or resulted in significant non-load related incidents.
ja__TE TIME EVENT October 01, 1989 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> Reactor at 55% power to replace power supply on "B" Main Feedwater Punp.
2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br /> Reactor at 100% power.
7 October 17, 1989 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br /> Reactor at 30% power to replace power / load unbalance tran d e r in the turbine control cabinet.
2052 hours0.0238 days <br />0.57 hours <br />0.00339 weeks <br />7.80786e-4 months <br /> Reactor at 100% power.
1 I
Wolf Creek Generating Station Monthly Operating Report October 1989 Page 5 of 5