Monthly Operating Rept for Oct 1989 for Wolf Creek Station. W/891114 Ltr
ML19332C035
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/31/1989
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-0200, 89-200, NUDOCS 8911220231
Download: ML19332C035 (7)


Text

. . - . .. -.. . .-

3 .

?' W$LF CREEK NUCLEAR OPERATING CORPORATK)N

' aann A.asney lr . vm pe emn

l. Nueser Opmenone 1

November 14, 1989 l NO 89-0200

' U. S. ~ Nuclear Regulatory Connaission ATTN: Document Control Desk

!! ail Station P1-137 Washington, D. C. 20555 '

i

Subject:

Docket No. Sn.482: October, 1989 Monthly Operating Report .

-l Gentlemen:

1 Ahtached is the October, 1989 Monthly Operating Report for Wolf Creek i

, Generating Station. This submittal is being made in accordance with the -

requirements of Technical Specification 6.9.1.8..

1 Very truly yours, 4 C. 4  :

John A. Bailey L Vice President Nuclear Operations ,

-JAB /aem ,

Attachment cc B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R. D. Martin (NRC), v/a D. V. Pickett (NRC), w/a h.1220231 891og3 g, ADOCK oSoco4g7 PDC r'.O. Box 411/ Burimgeon, KS 6816301 F%me: (316) 364-8831 An Equal opporamny Employer W'*C VET

, s, , - . . . - , - . . ~ . ~ _ . - , - . . . . . . . - . . . . . . . . _ . . - - . , . . . - - - . _ . . - . . . . , - . . - . . ,

I LAttachment'to'NO 89-0200 t r ,

4 NOLF CREEK NUCLEAR OPERATDG OTPORATION NOLF CREEK GENERATDG STATION 10NIHLY OPERATDG RERRT 1 10tmit October YEAR: 1989 Docket No.: 50-482 Facility Operating License No.: NPF-42 Report No. 56 _

-(

i-Prepared by:

Merlin G. Williams t

t t

d

i i'

NttachmenttoNO 89-0200

. i 4 . ,

1 1

l SLNMARY l

)

I The following report highlights the operating experience of Wolf Creek Generating Station for the nonth of October,1989. This report is being i provided pursuant to Technical Specification 6.9.1.8. 1 I

I. StM4ARY OF OPERATItG EXPERIENCE I On October 01, at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br />, reactor power as reduced to 55% to replace a l power supply on "B" Main Feedwater Punp. At 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br /> reactor power m a i returned to 100%.

On October 17, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, reactor power ma reduced to 30% to replace the power / load unbalance transducer in the turt>ine control cabinet. At 2052  ;

hours reactor power es returned to 100%.

On October 30, at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br /> rnactor power as increased 2.2% due to a revised calorimetric sucaiure using measured steam flow versus measured '

feed flow. This as done in response to an apparent feedwater venturi fouling proble.

(

II. MAJOR SAFETIY REEATED MAINTENANCE JCPIVITIES

1. Replaced input relay K129 train "A" in the Solid State Protection Syste (SSPS).
2. Replaced engine driven jacket eter pump nochanical seal on Diesel Generator "A".
3. Replaced 4-way actuator on Feedwater. Isolation Valve AEEV040.

Wolf Creek Generating Station Monthly Operating Report October 1989 Page 1 of 5

~

i

. Attachment to NO 89-0200

. ~ i 9

OPERATDG IRTA REKRT DOCKET NO. 50-482 NOIE CREEK GENERATING STATION NOLF CREEK NUCLEAR OPERATDG CCRPCRATICN IRTE 11-01-89

(%EPIETED BY M. Williams l TELEMENE316-364-8831 OPERATDG STMUS .

1. Reporting Periods October, 1989 Gross Hours in Reporting Period 745 1
2. Currently Authorized Power Ievel(NWt): 3411 Max. Depend. Capacity (MHam-Net): 1135 Design Electrical Rating (NNe-Net): 1170
3. Power Invel to Nhich Restricted (If Any)(We-Net): N/A 4.' Reasons for restriction (If Any): N/A

'Ihis Month Yr to Date Cumulative

5. Number of Hours Reactor was Critical 745.0 7,251.3 28,835.4
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 l
7. Hours Generator an Line 745.0 7.155.6 28,323.1

(

8. ' Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thernal Energy Generated (NHR) 2,516,573 24,144,000 93,716,117
10. Gross Electrical Energy Generated (MNR) 866,128 8,353,629 32,522,634
11. Net Electrical Energy Generated (NHR) 831,317 8,017,985 31.031,091
12. Reactor Service Factor 100.0 99.4 79.0
13. Reactor Availability Factor 100.0 99.4 80.0
14. Unit. Service Factor 100.0 98.1 ,

77.6

. 15. Unit Availability Factor 100.0 98.1 77.6

16. Unit Capacity Factor (Using NDC) 98.3 96.8 75.3

- 17. Unit Capacity Factor (Using Design NWe) 95.4 93.9 72.7 l 18. Unit Forced Outage Rate 0.0 0.7 4.8 l

l 19. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of each):

Refueling Outage on March 15, 1990, for 70 days.

20. If Shut Down at Erx3 of Report Period, Estinated Date of Startup: N/A
j. Wolf Creek Generating Station l Monthly Operating Report October 1989 Page 2 of 5 1

1

Attachment'to NO 89-0200

-.- -t 4,

AVERIGE IRILY UNIT POWER IAVEL DOCKET NO. 50-482 WOLF CREEK GDERATIIG STATIN WOLF CREEK NUCLEAR OPERATI!G OCRP@ATIN IRTE 11-01-89 CmPIETED BY M. Williams .

TE[EPENE316-364-8831 IRY AVERAGE DMLY POWIR LEVEL IRY AVERAGE IRIIX 10WER IAYEL '

(PHe-Net) ()Me-Net) 1023 4

1 17 960 2 1121 18 1121 I 3 1122 19 ' 1122 4 1123 20 1122 5 1123 21 -1126 6 1123 22 1126 7 1123 23 1125 8 1123 24 1125 9 1123 25 1124 10 1124 26 1125 11- 1123 27 1124 12- 1122 28 1124 13 1122 29 1124

'1' 4 - 1122 30 1134 15 1122 31 1149 16 1122 +

Wolf Creek Generating Station Monthly Operating Report October 1989 Pago 3 of 5

.n.- - , ., _ -

o -

Attachment tO;NO 89-0200 -

~'

UNIT SHUTDOWN AND POWER REDUCTIONS '

DOCKET No. 50 4824_

WOLF CREEK CENERATING STATION' VOLF CREEK NUCLEAR OPEFATING CORPORATION DATE 11-01-89 COMPLETED BY M. Williams REPORT MONTH October. 1989 TELEPHONE 316-364-8831 TYPE METHODS SHUTI MG F:-FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /COMENTS No Date S: SCHEDULED fBOURS) (1) OR REDUCING POWERf2) 7 891001 F 0 B 5 Reduced reactor power to SSI to replace a power supply.

on "B" Main Feedwater Pump.

8 891017 F 0 B 5. Reduced reactor power to 30Z to replace power / load unbalance transducer in the turbine control cabinet.

SUMMARY

Unit operated near 100Z power throughout the month with exception to the above mentioned derates.

(1) REASON: A EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTIhTED

5. REDUCED LOAD.
9. OTHER i

Wolf Creek Generating Station Monthly Operating Report October 1939 Page 4 of 5 m . _ .. . - _ . . . _ . . . .

V,. ..

F r

_Attqctlment to NO 89-0200 WOLF CREEK NUCIEAR OPERATING CORPORATION HOIE CREEK GENERATING STPLTICN UNIT 10. 1 KNIH Octr h r, 1989 SGMARY OF OPJRATI!G l'MPERIENCE I.icted below in chronological sequence is a sunnary of operating experiences far this nonth which required load reduction or resulted in significant non-load related incidents.

ja__TE TIME EVENT October 01, 1989 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> Reactor at 55% power to replace power supply on "B" Main Feedwater Punp.

2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br /> Reactor at 100% power.

7 October 17, 1989 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br /> Reactor at 30% power to replace power / load unbalance tran d e r in the turbine control cabinet.

2052 hours0.0238 days <br />0.57 hours <br />0.00339 weeks <br />7.80786e-4 months <br /> Reactor at 100% power.

1 I

Wolf Creek Generating Station Monthly Operating Report October 1989 Page 5 of 5