Technical Specification for Amendment No. 221 Re Extension of Allowed Outage Time for Emergency Diesel Generator Load Sequencer
ML050900016
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/29/2005
From:
Office of Nuclear Reactor Regulation
To:
References
TAC MC5878
Download: ML050900016 (2)


Text

TABLE 3.3-3 (Continued)

H ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION 0

tri MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION 3

U3

9. Engineering Safety Features Actuation System Interlocks
a. Pressurizer Pressure, 3 2 2 1,2,3 21 P-I I LUi
b. Low-Low Tavg P-12 4 2 3 1,2,3 21 tjj c. Reactor Trip, P-4 2 2 2 1,2,3 23
10. Emergency Generator 2 1 2 1,2,3,4 15 I Load Sequencer 0.

1.

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

  1. The Steamline Isolation Logic and Safety Injection Logic for this trip function may be blocked in this MODE below the P-1I (Pressurizer Pressure Interlock) Setpoint.
  • MODES 1, 2, 3, 4, 5 and 6. I During fuel movement within containment or the spent fuel pool.
        • Trip function automatically blocked above P-1 I and may be blocked below P-l I when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 14- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 15 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE ACTION 16- With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within I hour.

ACTION 17- With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

ACTION 18- With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 7 days.

After 7 days, or if no channels are OPERABLE, immediately suspend fuel movement, if applicable, and be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 19- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

MILLSTONE - UNIT 3 3/4 3-24 Amendment No. 5, 7, 89, I4-29,20, 219, 221