ML19322B938

From kanterella
Revision as of 00:45, 11 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO-2-79-53/1P:on 791207,recirculation Sys Sample Line Outer Valves Isolation Function Inoperable.Caused by Improper Testing of Installed Jumper.Jumper Removed,Valves Tested for Manual & Automatic Isolation & Found Operable
ML19322B938
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/10/1979
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
NUDOCS 7912190566
Download: ML19322B938 (2)


Text