MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
t-E g Entergy Operations, Inc.
1448 S.R. 333
- -Entemvy RusselIville, AR 72802 Tel 479-858-4619 Dale E. James Acting, Director.
Nuclear Safety Assurance 1CAN060501 June 6, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request Response to NRC Request for Additional Information on Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51 REFERENCE 1 Entergy letter dated December 20, 2004, Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device (1CAN120401)
Dear Sir or Madam:
In letter dated December 20, 2004 (Reference 1), Entergy requested an Operating License Amendment for Arkansas Nuclear One, Unit 1 (ANO-1) regarding the polar crane lifting tripod.
This tripod will be used to lift the increased load of the new reactor vessel head with the reactor building polar crane. On March 15, 2005, the NRC Staff requested additional information regarding the analysis performed for the ANO-1 lifting tripod. Attachment 1 provides Entergy's response to this request.
As discussed in Reference 1, Entergy requested approval of the proposed amendment by August 1, 2005. There are no commitments being made with this response. If you have any questions or require additional information, please contact Steve Bennett at 479-858-4626.
I dedare underpenaltyof perurythattheforegoing istrue and correct. Executed on June 6,2005.
Sincerely,
/ EJ/sk
Attachment:
Response to NRC Request for Additional Information on Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device l
, 4-I CAN060501 Page 2 of 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas W. Alexion MS 0-7D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205
Attachment I I CAN060501 Response to NRC Request for Additional Information on Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device to 1CAN060501 Page 1 of 2 Response to NRC Request for Additional Information on Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device RAI 1. In the last paragraph on Page 2 of Attachment 1, the licensee states that th6 resultant load factor is 0.02, which is well below, the 0.15 minimum dynamic factors; therefore, Entergy is applying a dynamic factor of 0.15 to the static load. Please provide the guidance used in determining the applicable dynamic load factor within Crane Manufacturers Association of America (CMAA) 70-1983, Specifications for Electric Overhead Traveling Cranes, and indicate whether the applied dynamic factor is consistent with the guidance.
ANO Response to RAI 1:
The guidance in CMAA 70-1983 is to use the greater of the following two values as a dynamic load factor:
- 1. Value calculated based on Hoist Speed, and
- 2. Minimum value = 0.15 As stated in the 9th line of the same paragraph of Reference 1, the hoist load factor 0.005 (Ref. CMAA 70-1983 - Section 3.3.2.1.1.4.2) is multiplied by the hoisting speed of 4 fpm (ANO-1 Polar Crane hoisting speed) to arrive at the resultant load factor of 0.02 (0.005 X 4=0.02).
The calculated dynamic load factor, 0.02, is less than the minimum dynamic load factor of 0.15.
Entergy is applying a minimum dynamic load factor of 0.15 to the static load to calculate the dynamic load.
RAI 2. On Page 3 of Attachment 1, the licensee provided a list of the equations used to calculate the allowable stresses. The licensee states that these allowable stresses are based on the allowable stresses provided in American National Standards Institute N14.6-1978 and in American Society of Mechanical Engineers Code, Section 111, and Paragraph NF-3322-1. It is not clearto the staff how these equations were developed.
Please clarify how you arrived at the numbers listed on your equations (i.e., the 7 bullets under "Given").
ANO Response to RAI 2:
The ANSI 14.6 guidance is to use 1/3 of the Yield Strength or 1/5 of the Ultimate Tensile Strength, whichever is more limiting as Allowable Tensile Stress (Fo.
There is no further guidance given to calculate other Allowables like Shear Stress, Bearing Stress, Tensile Stress (at the pin holes), Compressive Stress, etc.
_ 4W~ C wiX Attachment 1 to 1CAN060501 Page 2 of 2 Hence the various coefficients are calculated with the help of ASME Code. For example the Allowable Shear Stress is 2/3 of the Allowable Tensile Stress.
Detailed explanation for the factors used for various Allowable Stresses are as follows:
Allowable Tensile Stress is equal to "Ft" (which is the minimum of 1/3 of Sy or 1/5 of Su).
The ASME Allowable Shear Stress is O.4SY which compares to the ASME Allowable Tensile Stress of 0.6Sy. The ratio of these two allowable stresses is 2/3 (=0.4/0.6). Hence, for the purpose of this calculation, the Allowable Shear Stress is considered as 2/3 of the Allowable Tensile Stress (Ft) or the lesser of (2 /3 )(1/ 3 )Sy and (2/3)(1/5)Su. Therefore, the same conservative method used to determine the Allowable Tensile Stress is applied in determining the Allowable Shear Stress for this calculation.
In a similar manner, the ASME Allowable Bearing Stress is O.9Sy. The ratio of Allowable Bearing Stress to the Allowable Tensile Stress is 3/2 (=0.9/0.6).
Hence, the Allowable Bearing Stress is considered as 3/2 of Ft or the lesser of (3/2)(13)Sy and (3I2)(1I5)Su. Therefore, the same conservative method used to determine the Allowable Tensile Stress is applied in determining the Allowable Bearing Stress for this calculation.
The ASME Allowable Tensile Stress at the pin is 0.45Sy which is 3/4 (=0.45/0.6) of the Allowable Bending Stress (O.6Sy). Hence, the allowable Tensile Stress at the pin is considered as 3/4 of Ft or the lesser of (3 / 4 )(1/ 3 )Sy and (314)(1/5)Su.
Therefore, the same conservative method used to determine the Allowable Tensile Stress is applied in determining the Allowable Tensile Stress. at the pin for this calculation.
The ASME Allowable Compressive Stress is 0.66Sy which is 1.1 (=0.66/0.6) of the Allowable Bending Stress (0.6Sy). Hence, the allowable Compressive Stress is considered as 1.1 of Ft or the lesser of (1.1)(1/3)Sy and (1.1)(1/5)S".
Therefore, the same conservative method used to determine the Allowable Tensile Stress is applied in determining the Allowable Compressive Stress for this calculation.
The approach used in the calculation is similar to multiplying the design load by 3 for Yield (or by 5 for Ultimate) and comparing the results with ASME allowables.