Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN092101, License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2021-09-30030 September 2021 License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 2CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 1CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 0CAN022102, Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping2021-02-0808 February 2021 Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping 2CAN112004, License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP)2020-11-17017 November 2020 License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP) 2CAN092003, License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2020-09-24024 September 2020 License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions 1CAN072001, Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-07-21021 July 2020 Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN022001, License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-02-24024 February 2020 License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121903, License Amendment Request, Revise Control Element Assembly Drop Time2019-12-18018 December 2019 License Amendment Request, Revise Control Element Assembly Drop Time 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN101903, Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2019-10-23023 October 2019 Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO 0CAN091901, Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 3142019-09-0505 September 2019 Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 314 2CAN081903, License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-14322019-08-29029 August 2019 License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-1432 1CAN051901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2019-05-29029 May 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. 0CAN041904, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis2019-04-29029 April 2019 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 1CAN121801, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2018-12-19019 December 2018 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121801, License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump2018-12-19019 December 2018 License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump 2CAN051801, License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection2018-05-24024 May 2018 License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection ML18094A1552018-03-29029 March 2018 Enclosures 2 - 6: Proposed EAL Technical Basis Document, NEI 99-01. Rev. 6., Proposed EAL Matrix Chart/Review Table and Supporting Referenced Document Pages 0CAN031801, Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-03-29029 March 2018 Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 1CAN031801, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-03-12012 March 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) 2CAN121702, License Amendment Request Post-Accident Instrumentation Technical Specification Revision2017-12-14014 December 2017 License Amendment Request Post-Accident Instrumentation Technical Specification Revision 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN101701, License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves2017-10-0202 October 2017 License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments 2CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 1CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 2CAN071701, License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-14322017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432 1CAN071701, License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process2017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process 1CAN061701, Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2017-06-0707 June 2017 Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line. 2CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. 2CAN101601, License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications2016-10-27027 October 2016 License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications 1CAN051602, Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-8052016-05-19019 May 2016 Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-805 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2023-07-27
[Table view] |
Text
i 4-Entergy Operations, Inc.
A-Entergy 1448 S.R. 333 Russeliville, AR 72802 Tel 479-858-4888 Jeffery S. Forbes Vice President Operations ANO 1CAN 120401 December 20, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request Proposed Operating License Amendment Regarding Uprating of the Tripod Special Lifting Device Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
REFERENCES:
1 Entergy letter dated June 8, 1984, Interim Response to OCNA038405 Control of Heavy Loads at ANO-1 & 2 (OCAN068402) 2 NRC letter dated October 11, 1984, Control of Heavy Loads (OCNA108406)
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests an Operating License Amendment for Arkansas Nuclear One, Unit I (ANO-1) to use the lifting Tripod under increased loads when lifting the new reactor vessel head using the reactor building polar crane.
The Tripod is classified as a Special Lifting Device which is used to remove and reinstall the reactor vessel head and certain vessel internals during refueling outages. The polar crane and the lifting devices are being uprated during the 1RI 9 refueling outage, scheduled for the fall of 2005. A license amendment has been determined to be required under 10 CFR 50.59 since the Tripod requires a change for compliance to the regulatory required design standards. Details of this request are provided in Attachment 1. A proposed change is being made to language in the ANO-1 Safety Analysis Report to reflect this change (Attachment 2).
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c) and it has been determined that this change involves no significant hazards consideration. The proposed change includes new commitments as identified in Attachment 3.
Entergy requests approval of the proposed amendment by August 1, 2005. This amendment will be used to support activities associated with the Unit One fall 2005 refueling outage.
4ilI
I CAN120401 Page 2 of 2 If you have any questions or require additional information, please contact Steve Bennett at 479-858-4626.
I declare under penalty of pejury that the foregoing istrue and correct Executed on December 20,2004.
Sincerely, JSF/sab Attachments:
- 1. Analysis of Proposed Operating License Amendment Change
- 2. Proposed Safety Analysis Report Changes (mark-up)
- 3. List of Regulatory Commitments cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas W. Alexion MS O-7D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205
Attachment I ICAN120401 Analysis of Proposed Operating License Amendment Change
Attachment I to 1CAN 120401 Page 1 of 7 Analysis of Proposed Operating License Amendment Change
1.0 DESCRIPTION
The proposed change revises the Arkansas Nuclear One, Unit One (ANO-1) Operating License to allow the use of a Lifting Tripod (Special Lifting Device) which is used to remove and install the reactor vessel head and certain vessel internals during refueling outages. This license amendment request is required by 10 CFR 50.59(c)(2) since Entergy has determined that the Tripod will not meet criterion (c)(2)(vi), Create a possibility for a malfunction of an SSC important to safety with a different result than any previously evaluated in the Final Safety Analysis Report.
Specifically, Entergy will be revising Section 9.6.1.7.1, Control of Heavy Loads Requirements, of the ANO-1 Safety Analysis Report (SAR) to state:
The reactor vessel head and intemals lifting tripod is classified as a special lifting device in accordance with NUREG-0612 which requires these devices to meet ANSI N 14.6-1978.
ANSI N14.6-1978 specifies that minimum yield strength of the material be used to determine the yield and ultimate strengths. Instead of the minimum yield strength of the material, the actual tripod Certified Materials Test Reports were used to ensure a safety factor of 3 for yield strengths.
This proposed SAR change is provided in Attachment 2.
2.0 PROPOSED CHANGE
The lifting Tripod which is suspended from the reactor building polar crane is classified as a Special Lifting Device in accordance with NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. NUREG-0612 invokes ANSI N14.6-1978, Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds or More for Nuclear Materials. ANSI N14.6-1978, Section 3.2.1.1 states that Special Lifting Devices shall have safety factors of 3 times the yield strength and 5 times the ultimate strength. Section 3.2.1.1 states that this analysis should be performed with minimum material yield strengths (interpreted to not allow actual component material strengths). In addition, NUREG-0612, Section 5.1.1(4) requires that a dynamic factor be included to the static load stresses. As a result, Entergy is unable to meet the specific requirements of ANSI N14.6-1978 when using typical minimum yield material strengths.
Therefore, in using actual Tripod Certified Material Test Reports (CMTRs) a safety factor of 3.57 is obtained and Entergy is able to comply with the NUREG-0612 committed requirements.
Therefore, Entergy is proposing to use actual material strength data from the Tripod CMTRs that were provided with the original Tripod procurement.
3.0 BACKGROUND
On December 22, 1981, the NRC issued NUREG-0612 for licensees to expedite review for ensuring proper handling of heavy loads. In a subsequent letter dated February 3, 1981, the NRC issued Generic Letter 81-07 which corrected and extended the date for compliance to Section 2.1 through 2.4 of the NUREG guidance. Section 5.1.1(4) of NUREG-0612 invoked ANSI N14.6-1978 for special lifting device qualification. This included an additional dynamic
Attachment I to ICAN120401 Page 2 of 7 load factor in addition to the static load of the limiting load being lifted.
Entergy discussed in letter dated June 8, 1984 (Ref. 1), that the Tripod did not meet the ANSI N14.6-1978 factors of safety to yield and ultimate. However, the NRC staff in letter dated October 11, 1984 (Ref.2) determined that the Tripod still retained a high degree of load handling reliability for meeting NUREG-0612.
As a result of primary water stress corrosion cracking found on the control rod drive mechanism (CRDM) nozzles and welds in the last several outages, Entergy has scheduled replacement of the ANO-1 reactor vessel (RV) closure head during the fall 2005 refueling outage. The new RV head is of similar design to the current head. In addition, Entergy is providing a new service structure and new control rod drive mechanisms (CRDMs). However, the new head, service structure, CRDMs, shield blankets, and most of the RV closure head studs will result in a total Tripod lift weight of approximately 184 tons. This is in excess of the current 150 ton rating of the polar crane and special lifting devices. Therefore, Entergy has chosen to uprate the polar crane to move this load without having to disassemble the components prior to making a move from and onto the head stand during refueling outages. A revised head drop analysis has been performed under the heavier loads and was found to be acceptable with no damage to the fuel or loss of function of operable safety related systems, structures or components.
Since the Tripod is classified as a Special Lifting Device its design and qualification is subject to the requirements of NUREG-0612 and ANSI N 14.6-1978. The following are the key regulatory considerations that are applicable to this license amendment request.
NUREG-0612, Section 5.1.1(4) requests that licensees who are handling loads in excess of 2,000 lbs follow the requirements of ANSI N14.6-1978 for Special Lifting Devices.
ANSI N14.6-1978 states in,
- Section 3.2.1.1 that special lifting devices have a material strength which has a safety factor of 3 to yield and 5 to ultimate.
- Section 3.2.1.1 that this analysis should be performed with minimal material yield strengths (interpreted to not allow actual component CMTR strengths),
- Section 5.2.1, Acceptance Testing, that each device shall be subjected to a load test equal to 150% of the maximum load to which the device is to be subjected.
In addition, NUREG-0612, Section 5.1.1(4) requires that the stress design factor stated in Section 3.2.1.1 of ANSI N14.6 should be based on the combined maximum static and dynamic loads that could be imparted on the handling device based on characteristics of the crane which will be used. However, NUREG-0612 does not provide a specific dynamic factor, but states that the overall stress design factor should be based on the combined maximum static and dynamic loads that could be imparted on the handling device. Therefore, CMAA (Crane Manufacturers Association of America) 70-1983, Specifications for Electric Overhead Traveling Cranes, will be used to provide guidance on determining appropriate dynamic factors. Section 3.3.2.1.1.4.2 of CMAA 70-1983, Hoist Load Factor, states that hoist load factor is 0.005 times the hoisting speed in feet per minute (fpm), but not less than 0.15 times the static load. The hoisting speed of the ANO-1 polar crane is approximately 4 fpm, which results in a load factor of 0.02 well below the 0.15 minimum dynamic factor. Therefore, Entergy is applying a dynamic factor of 0.15 to the static load.
to ICAN120401 Page 3 of 7 The portion of the lifting Tripod that does not meet the ANSI N14.6-1978 criteria is the lifting eye as shown on the attached diagram. The lifting eye provides the interface between the frame of the Tripod and the load cell that provides weight measurements of the lifting devices and the load below the polar crane. The lifting eye is constructed of a single machined billet of steel. The legs of the Tripod are directly welded to the lower part of the lifting eye. Entergy has determined that the lifting eye portion of the Tripod cannot be modified or redesigned without creating additional structural and alignment concerns. Entergy believes that the existing Tripod retains sufficient design margin to warrant continued use with the new loads being planned.
4.0 TECHNICAL ANALYSIS
An analysis of the stresses on the Tripod has been performed under the guidance of NUREG-0612 and ANSI N14.6-1978. The design load for the Tripod is the nominal static lift load of the reactor vessel closure head and support structure with an additional 15% dynamic loading factor due to vertical hoisting. The polar crane and lifting devices are being conservatively uprated to 190 tons.
Nominal Static load = 190 Tons = 380,000 lbs. = 380 kips.
Design Load = 1.15 times 380 kips = 437 kips.
The following allowable stresses are based on the ratio of the allowable stresses provided in ANSI N14.6-1978, Paragraph 3.2.1, which are 1/3 Yield Strength (Sy) or 1/5 of Ultimate Tensile Strength (Su) and the allowable stresses in ASME Code,Section III, Paragraph NF-3322-1.
Given:
- Tensile Stress, Ft = 1/3 Sy but not to exceed 1/5 Su
- Tensile Stress at pin holes Ftoph = 3/4 Ft
- Shear Stress, F, = 2/3 Ft
- Bearing Stress, Fp = 1 % Ft
- Compressive Stress = (Allowable Compressive Stress + 0.6 Sy] x Ft
- Bending Stress = [Allowable Bending Stress + 0.6 Sy] x Ft
- Design Temperature = 100° F ambient temperature The steel shall meet the requirements of the ASTM A36.
Minimum Yield Strength: Fy or Sy= 36 ksi at ambient temperature Ultimate Tensile Strength: Fu or Su = 58 ksi at ambient temperature (lowest value),
Minimum edge distance requirements were applied per ASME Section III, NF-3324.6 (b) (1):
"Minimum Edge Distance in Line of Load: In both bearing and friction type joints, the minimum distance from the center of the end bolt in a connection to that edge of the connected part towards which the load is directed is determined in accordance with either NF-3324.6 (b)(1)(a) or (b)(1)(b).
Attachment I to 1CAN120401 Page 4 of 7 Results of analysis:
At pinhole of Tripod eye using the minimum material yield strengths of ASTM A36 steel:
Max. Tensile Stress = 8.35 ksi < 0.75 x (1/5) x 58 ksi = 8.7 ksi allowable.
Interaction Ratio (IR) = 0.96 <1.0 [safety factor of 3.125 to yield] Acceptable Max. Bearing Stress = 11.65 ksi < 1.50 x (1/5) x 58 ksi = 17.40 ksi allowable.
Interaction Ratio = 0.67 <1.0 [safety factor of 4.478 to yield] Acceptable Max. Shear Stress = 8.35 ksi > 7.73 ksi allowable based on (2/3) x [minimum of (1/3) x 36 ksi, (1/5) x 58 ksi]
= IR =8.35 + 7.73 = 1.08 > 1.0 [safety factor of 2.78 to yield] Not Acceptable.
At pinhole of Tripod eye using the allowable stresses based on Certified Material Test Report data:
CMTR Yield Strength: Fy or Sy = 46.5 ksi at ambient temperature CMTR Ultimate Tensile Strength:Fu or Su = 74.3 ksi at ambient temperature, Allowable Shear Stress based on 1/3 of Test Certificate Yield Strength =
(2/3) x (1/3) x 46.5 = 10.33 ksi.
Allowable Shear Stress based on 1/5 of Test Certificate Ultimate Tensile Strength =
(2/3) x (1/5) x 74.3 = 9.93 ksi. [controlling]
Max. Shear Stress = 8.35 ksi < 9.93 ksi allowable as shown above.
IR = 8.36 + 9.93 = 0.84 <1.0 [safety factor of 3.57 to yield] Acceptable The safety factor of 3 required by ANSI N14.6-1978 already provides a significant safety margin over the actual loads being lifted by the Tripod. Using actual CMTRs the ANO-1 Tripod will exceed the safety factor of 3 to yield, which provides a fully acceptable design margin for the Tripod material strengths. Entergy will also perform a load test of the Tripod at 150% of the static load increased by 1.15 for the dynamic load factor per ANSI N14.6-1978.
The minimum edge distance requirements were confirmed to be met. Therefore, Entergy believes that the proposed change meets the intent of ANSI N14.6-1978 by assuring that the safety factor of 3 to yield is met.
Attachment I to ICAN120401 Page 5 of 7
5.0 REGULATORY ANALYSIS
5.1 Applicable Regulatory Requirements/Criteria 5.1.1 10 CFR 50. APDendix A General Design Criteria. The ANO-1 Tripod is not safety related and does not provide a fission product boundary or mitigate any design basis accidents. None of the General Design Criteria applies to the special lifting devices.
5.1.2 ANO-1 Safety Analysis Report (SAR) - The ANO-1 SAR in Section 9.6.1.7.1 Control of Heavy Loads Requirements states that the ANO-1 licensing basis for NUREG-0612 is based on the NRC's Safety Evaluation Report (SER) of October 11, 1984. In the SER, the NRC accepted a lower safety factor to yield and ultimate strengths for this same Tripod. The basis for the acceptance was that the actual loads of the RV head were well below the design rating. However, Entergy has determined with the uprating of the crane that the previous licensing basis should not be applied to new or uprated equipment. Therefore, a change to the SAR is being proposed that will allow the actual CMTRs to be used for the ANO-1 Tripod.
5.2 No Significant Hazards Consideration The proposed change revises the Arkansas Nuclear One, Unit One (ANO-1) Operating License to allow the use of the existing Tripod (designed as a Special Lifting Device) which is used to remove and set the reactor vessel head during refueling outages. Specifically, Entergy will revise Section 9.6.1.7.1 of the ANO-1 Safety Analysis Report (SAR) to state:
The reactor vessel head and internals lifting tripod is classified as a special lifting device in accordance with NUREG-0612 which requires these devices to meet ANSI N14.6-1978. ANSI N14.6-1978 specifies that minimum yield strength of the material be used to determine the yield and ultimate strengths. Instead of the minimum yield strength of the material, the actual tripod Certified Materials Test Reports were used to ensure a safety factor of 3 for yield strengths.
This license amendment request is required by 10 CFR 50.59(c)(2) since Entergy has determined that the Tripod will not meet criterion (c)(2)(vi), Create a possibility for a malfunction of an SSC important to safety with a different result than any previously evaluated in the Final Safety Analysis Report.
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The ANO-1 Tripod does not perform a safety function required by 10 CFR 50. The Tripod serves to perform heavy load movements during refueling outages including the reactor vessel head. Safe load paths have been established in accordance with NUREG-0612 to ensure that the fuel and safety related equipment required to be inservice are protected. Use of actual Tripod eyelet Certified Material Test Reports (CMTRs) demonstrates that a safety factor of 3 to yield is maintained and that the lifting devices will perform their design function under maximum lifted loads. The Tripod does not serve any mitigative functions to lessen accidents.
Therefore, the proposed change does not affect the probability or consequences of any ANO-1 analyzed accidents.
Attachment I to ICAN120401 Page 6 of 7
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The only time that the Tripod is performing heavy loads movements is during Refueling operations. Safe load paths and load drop analyses have been performed to assure that heavy loads movements will not cause fuel damage or cause safety related equipment to become inoperable. The proposed use of CMTRs instead of minimum yield strength of the material still assures that the Tripod will perform its required function to not create an accident. In addition, there is no change to the operation of the Tripod that would create a new failure mode or possible accident.
Therefore, the proposed change does not create the possibility of a new or different type of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The design margin for the Tripod is established by NUREG-0612 and ANSI N14.6-1978. A factor of safety of 3 for yield strength and 5 for ultimate strength for both the static and dynamic load factors is required to be met. These factors of safety provide sufficient margin to assure that the Tripod will perform its design function of maximum lifted loads. In addition, the use a dynamic load factor of 1.15 above the static load is well above the actual dynamic factor to be experienced from the design lift speed of the polar crane. The use of CMTRs does not result in a significant reduction in the margin of safety of the Tripod. In addition, the Tripod will be load tested to 150% of its design static and dynamic loading which will further assure adequate safety margin.
Therefore, the margin of safety is not changed by the proposed change to the ANO-1 SAR.
5.3 Environmental Consideration The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 PRECEDENCE Entergy is not aware of other licensees who have sought approval for using CMTRs instead of minimum yield strength for Special Lifting Devices per ANSI N14.6-1978.
Attachment I to 1CAN1 20401 Page 7 of 7 Diagram of RV Closure Head Lifting Tripod Single Machined Piece 4 7 -f Lifting Eye 12" X 21" X 54.5" 6" X 15" X 16.5" Lk 6 9132" dia. hole
Attachment 2 ICAN120401 Proposed Safety Analysis Report Changes (mark-up)
ARKANSAS NUCLEAR ONE Unit 1 the emergency drum brake system sets, controlling load if all power is removed from the hoist and the load starts to lower. This system is normally not set during normal duty cycles.
9.6.1.7.1 Control of Heavy Loads Requirements NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" contains the NRC guidance to ensure that load handling systems are designed and operated such that their probability of failure is low and appropriate for the critical tasks in which they are employed. There are eleven (11) cranes installed in ANO-1 that fall under the guidelines of NUREG-0612. They are (1) the Reactor Building Polar Crane (Equipment No. 12); (2) the Fuel Handling Crane (L3); (3) the Auxiliary Fuel Handling Crane (a 2-ton monorail attached to L3); (4)the Intake Structure Gantry Crane (L7); (5 - 8) four (4) Reactor Coolant Pump Maintenance Jib Cranes (L32, L32B, L32C, L32D); the Reactor Building General Maintenance Crane (L37); and the Turbine Building Cranes (L-1 and 2L-1) when used to lift loaded spent fuel casks. ANO-1 has implemented the NUREG-0612 Phase I guidance for these load handling systems. In a Safety Evaluation issued in October 1984 (OCNA108406), the NRC concluded that the Phase I requirements of NUREG-0612 had been satisfied for ANO-1 for the Reactor Building Polar Crane, the Fuel Handling and Auxiliary Fuel Handling Cranes, and the Intake Structure Gantry Crane. In a June 26, 1985 generic letter (Generic Letter 85-11) (OCNA068520), the NRC further concluded that the NUREG-0612 Phase II effort was considered complete.
The four Reactor Coolant Pump Maintenance Jib Cranes are installed on top of the Steam Generator Cavities and are used to service the Reactor Coolant Pumps, Steam Generators, and Pressurizer. These cranes are 2-ton capacity wire rope hoists which are designed, operated and maintained in accordance with ANSI/ASME B30.11 c-1 992 and B30.16c-1992. The Reactor Building General Maintenance Crane is a 10-ton capacity, electromechanical boom crane which is designed in accordance with the requirements of API-2c, 4th Ed. and the applicable sections of ANSI/ASME B30.5b-1992. These cranes are seismically designed in their unloaded condition. The jib crane hoists are removed and stored outside the Reactor Building during power operations and the jib crane booms remain installed and are secured to withstand an SSE during power operations. The boom crane is stored in a secure position inside the Reactor Building during power operations with its boom secured to a boom storage structure.
The reactor vessel head and internals lifting tripod is classified as a special lifting device in accordance with NUREG-0612 which requires these devices to meet ANSI N14.6-1978. ANSI N14.6-1978 specifies that minimum yield strength of the material be used to determine the yield and ultimate strengths. Instead of the minimum yield strength of the material, the actual tripod Certified Materials Test Reports were used to ensure a safety factor of 3 for yield strengths.
9.6.2 SYSTEM DESCRIPTION AND EVALUATION 9.6.2.1 Receivinq and Storing Fuel New fuel assemblies are received in shipping containers and then transferred to dry storage racks or spent fuel storage racks which can then be transferred to the reactor building through the transfer canal. This is accomplished by lifting a new fuel assembly from the new fuel racks and placing it in the new fuel elevator which is attached to the side of the spent fuel pool. The elevator is in its highest position, such that the top of the fuel extends out of the water. When the elevator receives a new fuel assembly, it is lowered to the bottom of the pool where the fuel storage handling bridge can lift it from the container and place it in the spent fuel storage racks.
Amendment No. 19 9.6-1 0
Attachment 3 ICANI20401 List of Regulatory Commitments to 1CAN120401 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED ONE- CONT COMPLETION DATE (If COMMITMENT TIME COMPL Required)
ACTION Entergy will revise Section 9.6.1.7.1 of the X The next ANO-1 SAR ANO-1 SAR to allow use of CMTRs instead amendment after NRC of minimum material yield strengths. approval of the license amendment.